2015 IRC Plumbing Test
{"name":"2015 IRC Plumbing Test", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"1. On a 2 story multifamily apartment building, a VTR terminates under a solar panel. The open area required for the VTR shall be calculated using:, 2. An island fixture vent is connected to a fixture drain using a common vent, that is conneced to a dishwasher. Is this allowed?, 3. An AAV is installed on a 300 gallon tank in a non-engineered design. Will an inspector allow this?","img":"https://www.quiz-maker.com/3012/images/ogquiz.png"}