2018 - JO 6000.50D, National Airspace System (NAS) Integrated Risk Management

1. An SRM is required when ____.
A. A new document is created.
B. There is a proposed change to the NAS.
C. A project is assigned.
2. What document is used to detail the procedures to follow when conducting an SRM assessment?
A. SRM Manual.
B. Draft SSD documents.
C. SMS Manual.
3. SRM assessments are required to be completed by the authoring organization with authority to implement the System Support Directive (SSD), typically _____ ____ _____.
A. Second level engineering.
B. Local.
C. Program Office.
4. SRM assessments are required at the national level on all new or changes to maintenance directives including schedules, tasks, and tolerances.
A. True.
B. False.
5. The goal of SRM is to:
A. Ensure that safety-related changes are documented.
B. Risk is assessed and analyzed.
C. Unacceptable risk is mitigated.
D. Hazards are identified and tracked to resolution.
E. The effectiveness of risk mitigation strategies is assessed.
F. The performance of the change is monitored throughout its lifecycle.
G. All of the above.
6. The Integrated Risk Management Checklist (IRMC) is an automated tool that can be found on the FAA’s _______ intranet site.
A. MyFAA.
B. TechNet.
C. Peabody.
7. Order ______ identifies the operational risks management techniques that must be followed to mitigate the probability or severity of an undesired event having a negative impact on the NAS:
A. 1320.58
B. 6032.1
C. 6000.15
8. ____ focuses primarily on activities or events that could result in flight delays or negatively impact performance metrics such as availability and reliability.
A. Safety Risk Management (SRM).
B. Operational Risk Management (ORM).
C. Generic Site Implementation Plan (GSIP).
9. Operational Risk Management (ORM) is the process of assessing an activity for its potential to negatively impact the operational NAS.
A. True.
B. False.
10. Whenever SRM and ORM conflict, ____ must always take precedence.
A. ORM.
B. SRM.
This will link you to the quiz PDF in the Documentation Quizzes Library:
http://nas.amc.faa.gov/phoenix/directDownload?db=dms&id=5921
This will link you to the quiz PDF in the Documentation Quizzes Library:
http://nas.amc.faa.gov/phoenix/directDownload?db=dms&id=5921
{"name":"2018 - JO 6000.50D, National Airspace System (NAS) Integrated Risk Management", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"1. An SRM is required when ____., 2. What document is used to detail the procedures to follow when conducting an SRM assessment?, 3. SRM assessments are required to be completed by the authoring organization with authority to implement the System Support Directive (SSD), typically _____ ____ _____.","img":"https://www.quiz-maker.com/3012/images/ogquiz.png"}
Powered by: Quiz Maker