ARAMCO

An educational illustration of a construction site with safety protocols in place, featuring workers using safety gear and holding work permits in a clear and structured environment.

Aramco Work Permit Safety Quiz

Test your knowledge on the Aramco work permit system with our comprehensive quiz! Designed for professionals in the field, this quiz covers essential safety protocols and guidelines to ensure a safe working environment.

Key Highlights:

  • 159 questions on work permit procedures
  • Multiple-choice format for an engaging experience
  • Perfect for certification and training purposes
159 Questions40 MinutesCreated by SafetyGuide317
For how long a certificate is issued to issuer and receiver?
2 Months
21/2 Years
3 Years
2 Years
Who will sign certificate of issuer and receiver?
Manager of construction
Head of T&D
Their division head
Shift supervisor
Who must sign the work permit to close it?
Competent person
Both issuer and receiver
Gas tester issuer and Receiver
Designated Representative
Why must work permit, be closed? Why work permit is closed? What is the reason to close work permit?
To communicate the status of work
To allow the permit to be extended
To allow gas test to be taken
To stop work
For how long, issuer needs/have to keep original work permit on file?
Up to end the work
30 days
3 Months
3 Years
Who should keep the work permit? Who should keep work permit on job site?
The fire watch
The Receiver
The issuer
The standby man
Where must the receiver keep work permit after it is issued?
Withsenior crew member
With in the 75 meter of the work permit
In the control room
Display at the job site or in his possession
When can a receiver leave the job site? Can receiver leaving the job site?
No, he cannot leave job site
When gas test reading is 0.0%LEL
Yes When the issuer has given permission
When All hot work stopped
To whom, the receiver can delegate/hand-over the permit, when leaving the job site?
Certified issuer
Supervisor or foreman
Senior craftsman
Certified Receiver
A restricted Area requires?
That receiver respond to emergency
That work permit is issued/ used work permt (system)
The certificated are issued
Designated Representative
What do you call an area where work permits are required?
A restricted area
A sensitive area
A controlled area
A dangerous area
Restricted area includes…. Restricted area include which locations?
Pump stations, sewerplants and wells
Fenced area, wells and community buildings pump stations, Gasoline station and gas wells
Wells, loading piers and welding shops
Wells, office building and welding shops
Which of the following is not a restricted area?
Loadng prevention
Dump site
Gasoline station
Tank form
Who decides wether an area should be restricted or not? If it has been decided that an area is restricted who make final decision?
Loss prevention
Issuer
The department manager
As mentioned in GI 2.100
Who can decide that work is low risk and work permit is not required?
Receiver
The issuer
Shift supervisor
Proponent Management
Why do we use the work permit system?
To renew certificate
To log accident
To prevent accident
To monitor contractor work hour
Work permit must be issued for…. Work permit issued for…. Work permit authorize…
General work on general location
Specific location and general work
Specific work on/at specific location
Specific work on general location
What is the purpose of the work permit system?
To authorize all work activities during a T&I on a form
To authorize specific construction or maintenance work
To document when receiver start work for timekeeping
To ensure that hot work is not done in restricted area
What type of work does the work permit system authorize?
Specific construction , maintenance or repair work
All work conducted for Saudi Aramco
All work done by maintenance or construction
Non-hazardous work where safety is important
We use work permit in hazardous area to….
Check Expired certificates
To be sure that precautions are taken
Identify alternate services
Use a designated representative
We use work permit in hazardous area to identify…
The designated representative
Alternate receiver
Expired premits
Hazards and precautions
What are two important reasons for using work permit?
To communicate and control work
To track control and manage emergency
To communicate to stop work
To track contractor's work hour
A work perit lists?
Maximum safety precautions
Government safety precautions
Mnimum safety precaution
OSHA safety precautions
Is a low risk activity, which don't require work permit, mean free hand to work crew? What is other consideration/ requirement for an activity, which don't require work permit?
Yes, they are free to how they perform a job
Requires to follow SA safety requirements and personnel control in work area
Yes but issuer must be on site
None of mentioned
A work permit issuer is responsible for….
The receivers certificate
Nothing once he issues a permit
Extending certificate
Equipment and/or a work area
Who should point out all hazards and write on the work permit?
The issuer
The fire watch
The stand by man
The receiver
An issuer has which responsibility?
Define safety precautions and stay there
Issues and receive work permit
Supervise the crew and sign the work permit
Define safety precautions and sign work permit
Is it important, that the issuer tell the receiver about safety hazards he may find at the job site? Why it is important for issuer to tell receiver about expected hazards of work are?
The receiver does not read the work permit
He receiver must respond to emergencies
The receiver may not have worked in the area before
The receiver must take gas test
What must issuer do before issuing the work permit?
Close the work permit and check the receiver certificate
Check the receiver certificate and get countersign
Provide first aid and assign a fire watch
Renew certificate and get countersign
A receiver is …… Who is work permit receiver?
Designated representative
Senior craftsman manager
Certified craftsman (A person certified to receive permit)
A Person nominated by his supervisor
Who should ask for work permit before starting work? Who should ask for work permit, when a crew/group want/going to start a job?
Standby man
The receiver
The fire watch
Group supervisor
What should be the first thing to do when receiver need work permit?
Present his certification to issuer and request for (required) permit
Get tools ready
Shutoff the circuit breaker
Do the isolation of equipment
What two things receiver must do before receiving a work permit?
Take gas test and check scoot air pack
Extend the work permit and take gas test
Read the permit and agree to all conditions
Train the fire watch and renew the permit
Can a recever refuse to sign a work permit?
Yes, if there is no issuer
No, he cannot
Yes when he is not agreed with conditions
He must sign, even he disagree with safety measures taken. And or think safety precautions are not sufficient
The receivers main responsibilities includes….
Being the designated representative
Comply with safety precautions agreed upon, with issuer
Filling and sign for issuer
Responding to operations emergencies
What joint responsibility do issuer and receiver shares? What responsibility do issuer and receiver share when signing a work permit?
Responding to emergency events
Naming the designated representative
Monitoring the work area
Safety of the work site/area Miantaining safety conditions at the site
Who is responsible for the safety of the work area?
The issuer
the receiver
Both issuer and receiver
Both fire watch and standby man
Why designated representative is sometime used? Why issuers need/require assistance of designated representative?
The issuer maybe busy and need help
The receiver did not come to work
The gas test found high level reading
Too many safety problems were found
What is the responsibility of designated representative?
Accept the receiver’s responsibilities
Sign the work permit
Inspect the work site (joint site inspection)
Authorise receiver’s responsibilities
Which section of work permit form, receiver can fill?
Section 2 – hazard identification and control
Hazard analysis checklist
Section 1 – Work Description
Cannot fill any section
Who goes on the joint site inspection?
The issuer/designated representative and receiver
The issuer and designative representative
The issuer and the area foreman
The issuer and gas tester
What is discussed during joint site inspection?
GI 2.709 requirements
Scope of work and equipment to be used
Check the fire watch’s certificate
Designated representative’s qualification
What is the purpose of joint site inspection?
To meet with the workers and observe their activities
To discuss the scope of work and identify hazard or risks
To see the work plan and its implementation
To check the availability of equipment and manpower
Why do the receivers go on the joint site inspection with issuer?
To take gas test
To start the work
To discuss hazards and risk (associated with the job)
To check the fire watch’s certificate
When would issuer make sure that, the equipment has been prepared for maintenance work?
During the joint site inspection
When the permit is closed
After issuing permit
After getting countersign
Which section of new work permit form is considered as cornerstone of new work permit system? Which section is considered as cornerstone in new work permit form? Which is most valuable addition in new work permit form?
Joint site inspection
Hazard analysis checklist
Risk assessment
Job safety analysis
Who must sign a work permit to renew/extend?
The new area Foreman and receiver
Superintendent countersign is required
The new issuer and receiver
Designated representative and receiver
Work permit is issued for ... Work permit can be issued for up to...
Two operational shifts
Two receivers shift
24 consecutive hours
One operational shift
A work permit can be issued for?
12 hours
24 hours
8 hours
All of above
A work permit can be approved/issued for.....
8 hours
30 hours
12 hours
30 Days
Normally, the period covered by one work permit shall not be exceeding, how many consecutive hours? With extension/renewal, the maximum time coved by a permit shall not exceed... Including issuing time, permit can be renewed for more then... Maximum time covered by a renewed permit, shall not exceed
16 hours
24 hours
8 hours
30 hours
For how long an issuer can issue a permit?
For one week only
For 10 hours
For as long as he will stay on duty, but not more than 24 hours
Only for 8 hours
When applying for Extended Work Permit, which one is applicable period? Extended Work Permit is issued for...
16 hours
08 hours
More than 2 operational shifts, but not more than 30 days
All of above
An Extended Work Permit is issued for.... Maximum time covered by Extended Work Permit is...
Not more than 30 days
Not more than one operational shift
Not more than 16 hours
10 days
Work permit can be issued up to 30 days if....
Only the cold work will be done
The work site is far away
It’s highly unlikely that conditions will change
The receiver cannot close the permit
Who must sign the work permit issued for up to 30 days? (including issuer and receiver)
Receiver and designated representative
The designated representative
Operation Foreman, issuer and receiver
Operation and maintenance division head Division head of issuer and receiver
What happen if work must continue past the time the original permit was to expire? What, if work must continue and original permit is about to expire? What should be done, if work must continue, past the original permit time? What you will do if work need more time to finish and permit is about to expire?
Work can continue until the job is complete
Extend the permit or issue a new one (Renew the permit)
Keep working but tell the issuer
Stop work and come back next day
Who is responsible for safety at the work, after permit has been renewed/extended?
The issuer and the receiver who sign the renewal/extension
The old issuer because he did the joint site inspection
The original issuer and receiver
No one after permit has been extended
When a permit is renewed, what should be done if it contain countersign of other organization/department?
Notify all countersigning organizations about permit renewal
Inform shift supervisor
No need to inform or take countersign again
Take countersign again with renewal
If the work permit is not issued during an emergency, what must be done to do the work?
Superintendent must approve
Wear SCUBA and perform work
All safety precautions must be taken
Perform joint site inspection
Why is the check list section important to issuer and receiver?
It makes sure that important steps have been taken
It controls the receiver’s break time
It defines the duration and scope of work
It tells them all the precautions to take
€Use a fire blanket” or “hand dig only”, are the examples of... “Use a fire blanket” or “hand dig only”, are the examples of what?
Basic safety
Working criteria
Additional precautions
Not safety precautions
The information entered in exact work location is important, because it describes that...
What are the equipments, can be used
Up to which time receiver can work
How many workers can be on site
Where the receiver can work
What must an issuer write along/with his sign, while issuing work permit? What must a receiver write along/with his sign, when receiving the work permit? What must an issuer and receiver write along/with their signs, in the work permit form?
Time and date and certificate number
Gas test, badge number and certificate numbe
Organization code, badge number and certificate number
Name, badge number and organization code
What must issuer write on the work permit?
Name, organization code and badge number
Name, organization code and badge number
Badge number and certificate expiry date
Gas test result, name and badge number
What information gas tester needs/have to write on work permit?
Time and date and certificate number
Gas test result, badge number and sign
Organization code, badge number and gas test result
Gas test, badge number, Name and certificate number
A work permit must be written in?
Arabic
Arabic and led penci
Ink pen
English
The issuer must stop the work if....
When the issuer go to his office
The job site was found to be unsafe
The issuer left the job sit
The issuer lost his cope of permit
What must the issuer do, after/when he stops work?
Write the reason on the permit
Close, then extend the permit
Get a countersign
Give his copy to the receiver
The receiver must stop work if...
He cannot find the issuer
The designated representative must leave
The work site become unsafe
The issuer leave the job site
What must the receiver do if he stops the work?
Tell the designated representative
Tell his immediate supervisor
Tell the senior craftsman
Tell/inform the issuer
What would be a good example, when a receiver must stop work?
Material has not yet arrive
He cannot wait for the countersign
He hear an emergency alarm
The backhoe run out of fuel
What might happen if a safety problem arises and receiver does not stop the work? When work site become unsafe and receiver does not stop work...
Countersignature become void
Accident can occur A Fire, Injury or Accident
His certificate expires
The work permit expires
When must be work permit close? When must the work permit be closed?
When the work is finished and/or work crew leaves
Before another permit is issued
After gas test taken
When the issuer leaves job site
What is the difference between hot and cold Permit
Cold use ignition source
Hot, use/involve ignition source
Both use an ignition source
Neither use an ignition source
Cold work includes ……
Sand removal and scaffold erection
Abrasive blasting and painting
Scaffold erection and using backhoe
Brush painting and abrasive blasting
An equipment opening/line break (Release) permit is required when?
Operator purge an equipment
Operator release hydrocarbon to flair
Pipe fitter open a line or install blind
Craftsmen build scaffold
Covering sewers is required by which work permit?
Confined space entry permit
Equipment opening/line break (Release)
Hot work permit
Cold work permit
What should be checked, before allowing entry into confined space?
Gas test, fire watch and barricade
Fire watch, standby man and gas test
Lighting, standby man and air mover (ventilation)
Air mover, respirator and countersignature
What should be checked before issuing an equipment opening/line break (Release) permit? What should be kept in concentration before working on equipment opening/line break permit? What are the three things you should check before opening an equipment or breaking/opening a line?
Safety harness, belt and safety glass
Ignition source, gloves and safety glass
Sewer, man way and air mover
Wind direction, draining and ignition source
If there is one welding machine and is used by a welding and an electric group, how many work permits are required?
One
Two work permits
Three
If issuer is agree one permit
When going to manhole to do welding job, what kind of permit is required?
Hot work and confined space entry permits
Hot and cold work permits
Cold work and confined space entry permits
Confined space entry permit
When working for well head tie-in job using crane and hand tools, what kind of permits are required?
Hot work and cold work permits
Hot work and confined space entry permit
Hot work, cold work and equipment opening/line break (release) permit
Equipment opening/line break permit (release)
With manual back filling, a crew need, engine operated compactor to do their job in 5 ft deep trench (excavation), what kind of permit is required? What kind of work permit(s) is required, when a crew need to do manual backfilling and compaction with engine operated equipment in a 5 ft deep excavation?
Cold work and confined space entry permits
Hot work and cold work
Hot work, cold work and confined space entry permits
Only confined space entry permit
For electric operated x-ray equipment, what type of permit is required?
Cold work permit
No permit is required
Hot work permit
Confined space entry permit
What type of work permit is required for sealed source radiography?
Hot work permit
No permit is required
Cold work permit
Equipment entry work permit
The use of air compressor in an operating area requires which work permit?
Equipment opening/line break (Release)
Confined space entry
Cold work permit
Hot work permit
Why a pipefitter cannot work on the same piece of equipment using a welder’s work permit? A pipefitter cannot work on the same piece of equipment using a welder’s work permit because...
Joint side inspection is not required for pipefitters job
Gas test are not required for pipefitters work
Each type of work involves different hazards
Welders are usually contractors
Can work in two different locations be covered under one work permit?
Yes
Only with superintendent approval
Only if agreed by issuer
No
If mechanical and electrical groups are working on the same equipment in restricted area...
They will use only one work permit
When the maintenance person agree to work without permit
Each group must have its/their separate work permit
When the foreman and superintendent agree on one work permit
What type of permit is required to take vehicle or construction equipment, inside a restricted area? The use of a vehicle in an operating area requires which work permit?
Confined space entry permit
Cold work permit
Vehicle entry permit
Hot work permit
What type of work permit is required to clean a tank from inside, perform inside inspection or work inside sewers?
Cold work permit
Hot and cold work permit
Hot/cold and confined space entry permit
Equipment opening/line break (Release)
What type of work permit is required when working in close proximity to a live electrical line?
Cold work permit
Hot work and confined space entry permit
Hot work permit
Equipment opening/line break permit
Abrasive blasting (sand blasting) requires what type of work permit in a restricted area?
Cold work permit
Hot work and confined space entry permit
Hot work permit
Equipment opening/line break permit
Which duty/type of scaffold is required for abrasive/sand blasting job? Abrasive/sand blasting is allowed on minimum...
Light duty
Any duty of scaffold
Very light duty
Medium duty (Scaffold)
What the issuer will check before, issuing permit for crane lifting?
Physical condition of lifting gears
Certificate of operator and rigger
Crane’s checklist
All of above
At what depth of an excavation, confined space entry permit requirement starts? Above/more-than which depth of an excavation/trench, confined space entry permit is required?
4 m
2.2 m
4 ft (1.2 m)
1.2 ft
What is required distance for a scaffold base, from edge of excavation?
Height of scaffold × depth of excavation
2.6 m
1.5 × depth of excavation
1 m
In what distance, heavy equipments shall not operate from edge of excavation?
1.5 × depth of excavation
1.8 m (6 ft)
2 m (6.5 ft)
3 m ( 10 ft)
What is the minimum distance from any pipe line, cable or other obstruction, where mechanical excavation cannot be performed?
1 m (3 ft)
1.8 m (6 ft)
2 m (6.5 ft)
3 m (10 ft)
Within how much distance to a hydrocarbon line, work permit is required?
23 ft
Inside fence area
75 ft (23 m)
100 ft
Within how many feet of a power line, work permit is required?
100 ft
50 ft (15 m)
200 ft
150 ft
What is the maximum distance required to be maintained from energized overhead power line, when voltage is unknown? (or above 250KV)
25 ft
Between goal posts
15 ft
3 ft
When welder have to vent a Nitrogen purged pipe to perform welding, from which point it should be vented?
Far away downwind
Upwind vent point
From the point where he have to weld
From any vent point
Does every work permit require sign, that gas test is conducted? Do every work permit need gas test?
No
Only confined space entry permit
Yes , all type of work permit require gas test
Only in the area where hydrocarbon is present
What is checked in a gas test?
Oxygen level o
Oxygen, flammable and toxic gases O2, H2S, Co & LEL
Flammable gas, inert gas and heavy gas
Oxy-acetylene, water vapours
What is oxygen deficiency?
Lower than 20% oxygenA lower than normal amount of oxygen
Too much oxygen
Oxygen that is not pure
High than normal amount of Hydrogen Sulfied
At which level of oxygen, breathing apparatus is required?
At 25%
Less than 20%
Less than 10%
Greater than 15%
What should be done if O2 level is less then 20%?
Breathing apparatus must be used
Division head must sign the permit
Work can be continued w/out use of breathing apparatus
O Breathing apparatus must be used and breathing apparatus division head must sign the permit
On what level of oxygen (O2), no work is allowed?
16.50%
22.80%
Any reading above 23.5%
None of there
Hot work is not allowed if the gases and vapour are measured at what reading of LEL?
10%
Below 0.5%
0.05%
Above 0.0%
What is the acceptable level of LEL to allow hot work?
10%
Below 0.5%
0.00%
Above 0.0%
On which reading of LEL, entry is not permitted in confined?
10% LEL (0.1 LEL) and above
0.05 LEL
0.5 LEL
50 % LEL
On which level of LEL, breathing apparatus is required to use?
0.5 % and above
At 0.0 LEL
0.05 LEL(5%) and above
10%
Which one is applicable for H2S Readings? Which one is correct, for H2S?
10 ppm or above breathing apparatus must be used
10 ppm to 100 ppm division head must sign the permit
Above 100 ppm No work (or confined space entry) allowed
All of Above
If H2S is present, at what level breathing apparatus is required? On which concentration/level of H2S breathing apparatus is required?
5 PPM
1 PPM
10 PPM and above
Above 50 PPM
Confined space entry is not allowed if...
CO is 1000 ppm
LEL 10%
H2S is above 100 ppm
All of Above
On which reading of gas test, breathing apparatus must be used? A breathing apparatus is required when... Breathing apparatus is required/to-be-used/mandatory when gas test result is/shows...
CO is 500 ppm
O2 18.5%
LEL 8%
All of Above
When receiver smells a gas, what should he do?
Inform safety department
Report to the loss prevention
Stop work and inform issuer to conduct gas test
Continue work and conduct gas test by himself
When a fire watch is required?
When a gas test are over %LEL
For any hot work permit
For high risk job
Whenever a fire could occur Whenever a ignition source is used
What would the issuer requires when welding, in-service hydrocarbon equipment? What would the issuer requires for welding, in area contains hydrocarbon? Who/what should be assigned when working near combustible material?
Fire department
Fire blanket
Fire watch
Standby man
What must the fire watch be?
An issuer
Trained
Certified
A receiver
Fire watch must know how to... What training, a fire watch should have? Which equipment, fire watch know how to operate?
Operate fire equipments, given to him Fire equipment given to him
Take gas test
Be a receiver
Operate process equipment
For welding activity, portable fire extinguisher shall be available within....
23 m (75 ft)
3 m (10 ft)
Not required for welding job
7.5 m (25 ft)
During welding operation, where will your fire extinguisher be located? During welding or when required with an equipment, whereyou will keep/place fire extinguisher?
With welder
Upwind position
On welding machine
Downwind position
What do we call the person who is required to be at a job site, because of a special skill he has? The person required on job site because/due-to his skill, is called...
Competent person
Designated representative
Standby man
Certified
What is one hazard, when/with doing hot work? What hazard would you find when doing hot work?
Vapour pressure
Ignition point
Ignition source
Flash point
Which work permit requires sewers (and or drains) to cover up to 75 ft?
Hot work permit
No work permit have such requirement
Cold work permit
Confined space entry permit
Why it is necessary to know the direction of wind?
To prevent garbage and dirt to enter at work area
To prevent sand from entering into open valve
To ensure that wind (containing flammable vapours or gas )will not blow into ignition source
None of above
Which non-flammable material is commonly used to purge process equipment?
Nitrate
Nitrate Oxide
Nitrogen
Nitrite
When preparing equipment for maintenance work, the issuer must make sure that it is... Before starting work on equipment, it must be make sure that equipment is...
Isolated repaired and certified
De-energized with power turned on
Electrified isolated and shutdown
Shutdown, isolated and de-energized
Two common methods of cleaning process equipment are.... How can process equipment be cleaned? Process equipments can be cleaned...
Streaming and gas testing
Water wash and steaming By water wash and/or steaming
(By) treating and clarifying
Purging and gas testing
Equipment is isolated to make sure that, it cannot be.... We isolate equipments to make sure it cannot be...
Start-up, leak or cause electric shock
Shutdown by accident
Slip trip or fall
Taken to shop for repair
Date of Birth
What are the methods of isolation?
Install tag and purge
Shutdown and clean
Remove piping and install blind
Install lockout and take gas test
Removing fuse from electric circuit or disconnecting electrical wiring is an example of...
Locking
Purging
Cleaning electrical equipment
Isolation Isolating electrical equipments
Installing locks and tags on electrical breakers prevents accidental...
Blind installation
Purging equipment
Start-up of equipment
Nitrogen release
Why do we install tag with lock? Why hold tags are installed?
To record a gas test
To explain why the lock is installed
To list safety precautions
To recover purging cycle
Who, from the work crew will install lock? Who install receiver’s locks?
One member from each work crew
Every member of the crew
The Foreman and the receiver
The issuer and the gas tester
The issuer must try to start-up equipment at the field switch after it has been isolated and before work starts, to make sure...
It has been purged and cleaned
There is no gas in the area
It cannot accidently start
The receiver’s tag is installed
What happen to the operation’s lock and tag, installed on equipment, when operator changes shift? When operators change shift...
The lock must be changed
The lock and tag must be changed
The tag must be changed
The key are usually transferred to new shift
The reason, equipment must be de-energized and de-pressurized before starting work is because… Why must equipment be de-energized and de-pressurized before work is started?
Electricity can be wasted
Lock and tags will be lost
Accidental start-up could happen People can be injured
Purged gas can be lost
Who should be the first organization to install lock and tag? Who install locks and tags first?
SCECO
Operations
Maintenance
Power distribution
What must operation do before removing their locks and tags?
Make sure the equipment can be safely started
Clean and purge the breaker
Take gas test and restart equipment
Make sure the equipment is gas free
When the operation person isolates the unit and install padlock...
Do the job quickly
Receiver will install his lock
Get tools and start work
They can start the job with instructions of foreman
For isolation lock, how many keys for one lock? How many keys with a pad lock used in LOTO?
One only
As many crew members
3 for each lock
One for issuer and one for receiver
How many padlocks are required, when 4 different contractors are working on single/one equipment?
4
Only one
5
6
If only issuer and receiver (one group) is involved in an activity, which needs isolation of an equipment, how many locks are required?
No lock is required
1
3
2
In a confined space entry, what is the most important thing to do?
Get a hot permit
Non sparking tools will be used
Insure that space is isolated
Gas release can be made safely
When the operation person installs the padlock to the switchgear, what should he do?
Work safely
Check the switch again to make sure that correct unit is isolated
Ensure that the unit is isolated
None of above
Who can remove lock, once installed? Who can/will remove lock?
Anyone who want to start the equipment
No one can remove it once it is locked
Foreman of the working crew
The one who installed lock / lock owner (mentioned on tag as lock owner)
Is there any condition when a lock can be forcefully removed?
It cannot be removed forcefully
When work permit is finished
When, the person who install lock, his supervisor or superintendent cannot be contacted
When any one need to start or energize that equipment
Who can remove a lock forcefully?
No one can remove a lock once it is installed o
Operation’s shift superintendent or foreman
Supervisor of working crew
Person who install lock can remove it only
What should be check/conformed before removing a lock forcefully?
Personnel and facilities are safe from injury or damage
Lock can be removed without any checks or precautions
Work permit is expired
All workers are in rest shelter
The safety of work site is a sole responsibility of an issuer.
The receiver can leave the job site anytime as long as he gets the permission from his supervisor.
Any worker can be assigned as standby.
What must be checked during the joint site inspection? Select all items that apply
Safety devices
Gas test
Attendance report
Equipment condition
What are the basic precautions for cold work? Select all items that apply
Special work procedure
Barricade and warning sign
Standby man
Gas test
PPE
Fire watch
{"name":"ARAMCO", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Test your knowledge on the Aramco work permit system with our comprehensive quiz! Designed for professionals in the field, this quiz covers essential safety protocols and guidelines to ensure a safe working environment.Key Highlights:159 questions on work permit proceduresMultiple-choice format for an engaging experiencePerfect for certification and training purposes","img":"https:/images/course6.png"}
Powered by: Quiz Maker