Risk/ Hazard Identification, Assessment and Management Policy
The purpose of this policy is to prevent possible harm to
Tamariki only
Tamariki and Kaiako only
Visitors only
Everyone that enters the premises
Risk/Hazards can be generated form
The physical environment
The people
Management system weaknesses
All of the above
All practicable steps will be taken to
Eliminate the risk
Isolate the risk
Minimise the risk
All of the above
Risks/hazards are best identified
by dividing a workplace into areas and using a team approach
by NOT dividing a workplace into areas and using a team approach
Check one or more support office risks/hazards?
Computer Use
Electrical Leads
Manual handling
Stairs
None of the above
Check one or more common risks/hazards in a childcare centre
Manual handling
Wet floors
Collision
Hazardous substances
None of the above
What would the Ds stand for in the process of risk/hazard identifcation
I
E
D
D
D
Determine Who
Determine Where
Determine When
Determine Why
Determine How
Determine the consequences
Risks/Hazards can be identified by
Accident and Illness form
Childcare daily check list
Risk and hazard identification/review form
Monthly support office checklist
All of the above
None of the above
It is everyone's responsibility to report risk/hazards. True or false?
True
False
Risks/hazards and control methods are recorded in the risks/hazards identification/review form. True or False?
False
True
Significant risks have the potential to cause serious injury and temporarily disable someone. True or False?
True
False
Risks/Hazards can be eliminated through;
Substitution
Removal of risk
Modifying equipment
Using administrative controls
PPE should always be selected according to the job and fit comfortably and properly. True or False
True
False
Risk score equals
Consequence + Liklihood
Consequence x Liklihood
Liklihood / Consequence
Consequence / Liklihood
Risks/hazards must be monitored and reviewed regularly.
Significant risks - monthly; Medium Risks - 3 monthly and Low risks - 6 monthly.
Significant risks - 3 monthly; Medium Risks - 6 monthly and Low risks - annually.
Significant risks - 6 monthly; Medium Risks - annually and Low risks - every 2 years .
All risks are reviewed annually.
Every time new equipment, activities and tasks are introduced the risks/hazards must be identified and recorded in the Risk/Hazard register. True or False?
True
False
Monitoring of the risks/hazards can be done by;
Examining records of site inspections
Examining training records
Examining accident and injury data
Workplace observations
When purchasing a new product or equipment, information on the safety of the product/equipment must always be requested. True or False?
True
False
{"name":"Risk\/ Hazard Identification, Assessment and Management Policy", "url":"https://www.quiz-maker.com/Q7DT5EU72","txt":"The purpose of this policy is to prevent possible harm to, Risk\/Hazards can be generated form, All practicable steps will be taken to","img":"https://www.quiz-maker.com/3012/images/ogquiz.png"}