  • Construction processes
  • Safety regulations
  • Project management
  • Materials and methods
78 Questions20 MinutesCreated by BuildingBrain247
The worth of the construction industry is about US $8.7 trillion, accounting for 12.2% of the world’s economic output
True
False
All construction projects require the preparation of contract documents
True
False
…………is issued when the building is 100% complete, the project must pass a final inspection by local building officials
Certificate of occupancy
Certificate of inspection
None of the answers
The construction industry provides employment for ……………….. People worldwide
200 million
200 thousand
100 million
…………. Represent exactly how the facility was constructed and they also incorporate all the changes to the original construction plan
As built drawings
Work drawings
Shop drawings
Construction projects may require thousands of professionals
True
False
Client meetings arranged to determine the purpose and objective of a proposed construction is referred to as
Debriefing
Seminar
Meeting
None of the answers
In the construction industry, the increasing complexity of buildings is
A challenge
A catastrophe
An opportunity
The professional that controls the overall design, specifications and finished materials of a project is
An architect
A structural engineer
An MEP engineer
None of the answers
Low entry requirements and small sized enterprises is an industry related characteristic
True
False
The conceptual or design stage is also known as
Architectural programming
Architectural modeling
Architectural visualization
None of the answers
The construction industry is a strategic tool to achieving sustainable development
True
False
Excavation work is not an essential part of the construction process and one of the most hazardous
True
False
…………..contains the project start and completion dates, the progress billing procedures, the insurance requirements, and other pertinent information
Construction documents
Construction work plan
Project files
It is essential that …………. Are allowed to work on roofs and that they wear footwear having a good grip
Only trained/competent persons
Only educated persons
None of the answers
Air bags and safety nets do not take precedence over safety harnesses
False
True
The Work at Height Regulations (WAHR) stipulate a minimum height requirement for work at height
False
True
The small platform fitted at the top of many stepladders is designed to
Support tools, paint pots and other working materials
Access higher levels of work safely
None of the answers
When it is reasonably practicable to carry out work safely other than at height
Work should not be carried out at height
Work can be abandoned
Work could be carried out at height
Jobs such as painting, gutter repair, demolition work or window replacement should normally be done using
Scaffolds
Trestles
Ladders
The state where concrete degenerates into a powder leading to serious structural weaknesses is referred to as …
Concrete cancer
Concrete denigration
Concrete weakness
There are two common materials used in the construction of ladders
Timber and aluminum
Aluminum and concrete
Concrete and Timber
MEWPs refers to ………
Mobile elevated work platforms
Movable elevation for work platforms
None of the answers
It is good practice to ensure that a person does not work alone on a roof.
True
False
………. Is a temporary structure used to support a non-self-supporting structure during its construction or refurbishment
False work
Temporary work
None of the answers
Falls on permanent stairs if there is no structural or maintenance work being done is an example of work at height
True
False
There are two common materials used in the construction of ladders
Timber and aluminum
Aluminum and concrete
Concrete and Timber
The small platform fitted at the top of many stepladders is designed to support tools, paint pots and other working materials
Support tools, paint pots and other working materials
Access higher levels of work safely
None of the answers
MEWPs can be moved in the elevated position
False
True
Immediate guard rails should be fitted such that any unprotected gap does not exceed 370mm
False
True
Jobs such as painting, gutter repair, demolition work or window replacement should normally be done using
Scaffolds
Trestles
Ladders
The recommended height to base ratio of prefabricated scaffold tower varies from 3:1 to 3.5:1, with a base not less than 1m
True
False
The small platform fitted at the top of many step ladders is designed to support tools and materials
True
False
MEWPs refers to ………
Mobile elevated work platforms
Movable elevation for work platforms
None of the answers
The top end of a ladder should rest on a solid surface and extend at least 1m above the landing place
True
False
Collapse of ground above cellars or pits is a cause of falls on demolition sites.
True
False
Issues to be considered in the size of an exclusion zone includes ……
The height of the structure
The effect of ground vibration on buried services
All the answers
Dust and fumes is a not a principal hazard of demolition work.
True
False
Asbestos is a common hazardous substance in demolition work.
True
False
……………where possible it should be removed before any other demolition work starts and must always be removed by a licensed contractor
Asbestos
Concrete
Coarse aggregates
………. Is a temporary structure used to support a non-self-supporting structure during its construction or refurbishment
False work
Temporary work
None of the above
The most economic yet most dangerous form of demolition is ……
Deliberate controlled collapse
Piecemeal
None of the answers
During demolition work, details of site access and entry should be included in …
Methods statement
Design documents
Demolition survey documents
The competent person in construction demolition work is often a ……
Specialist structural engineer
Specialist mechanical engineer
Specialist electrical engineer
In demolition work, the Health, Safety and Environment authorities must be notified before work begins if it is to last for ……
30 days and more than 500 workers
10 days and more than 500 workers
100 days and more than 5000 workers
All persons including the shot firer must be outside the exclusion zone
True
False
Planning and execution of a demolition project should only be done by competent persons
True
False
An exclusion zone comprises of ………
Plan and drop area
Debris and buffer area
All of the above
For complex demolition work, expert advice from structural engineers will not be necessary.
False
True
Any demolition of structures constructed from …………….. Will give rise to dust containing silica
Stone and bricks
Concrete aggregates
All of the above
In a risk assessment involving a young person of school age (16 years or less),………of the child should be notified of the outcome of the risk assessment
All of the above
Guardian
Parent
In risk assessment, trivial hazards are not ignored.
False
True
…………… attempts to quantify the risk level in terms of the likelihood of an incident and its subsequent severity
Quantitative assessment
Qualitative assessment
Hybrid assessment
Every self-employed person shall make a ‘suitable and sufficient’ assessment of the risks to which they may be exposed
True
False
Injuries and work-related ill-health are identified and reported in ………
Reactive monitoring arrangements
Proactive monitoring arrangements
None of the above
The risk score is calculated as a product of severity and likelihood.
True
False
Occupational stress is an example of a ………… health risk in the construction industry
Psychological
Physical
Biological
………..is the more common form of risk assessment in the construction industry
Qualitative assessment
Hybrid assessment
Quantitative assessment
Advice on control measures for identified risks, may be available from…
Trade associations
Social groups
Employees’ complaints
………………describes a risk assessment which covers similar activities or work equipment in different departments, sites or companies
Generic risk assessment
Comprehensive risk assessment
Combined risk assessment
The purpose of risk assessment is to reduce the remaining risk, which is called the ……
Residual risk
Remaining risk
Trivial risk
€¦â€¦â€¦â€¦â€¦â€¦â€¦â€¦refers to the active monitoring of the adequacy, development, implementation and deployment of the health and safety management system
Measures of success
Measures of the hazard burden
Measures of failure
The third step in the five step process developed by HSE for risk assessment entails …
Evaluate the risks
Look for the hazards
Record the significant findings
……………………..is any incident that could have resulted in an accident
Near miss
Accident
Hazard
Pathogens is an example of a ………… health risk in the construction industry
Biological
Psychological
Physical
Risk assessment is an essential part of the planning stage of any health and safety management system
True
False
Risk controls should be reviewed …………
Periodically
Only when conditions change
None of the above
……………. Is any unplanned event that results in injury or ill-health of people, or damage or loss to property, plant, materials or the environment or a loss of a business opportunity
Hazard
Accident
In controlling risks, the first option is the use of personal protective equipment.
True
False
Measurement falls in which category of the PDCA cycle?
CHECK
DO
ACT
PLAN
Where there are more than ………., the significant findings of the assessment shall be recorded
4 employees
40 employees
14 employees
There is no single reliable measure of health and safety performance.
True
False
Risk assessment is part of the planning and implementation stage of the health and safety management system recommended by the HSE.
True
False
Acute health effects may take several years to develop.
False
True
External stakeholders interested in information from safety performance measurements may include: ……
Regulators
Safety students
None of the above
The timescale in which risk control measures are implemented will always depend on the high priority ratings.
True
False
Any risk assessment shall be reviewed if...……
Significant change has taken place
Employees retire from service
None of the above
Risk assessment covers only employees and not members of the public.
False
True
{"name":"204", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Test your knowledge about the construction industry with this comprehensive quiz! Whether you're a professional, student, or just interested in construction, this quiz covers a wide range of topics related to construction practices, safety regulations, and industry standards.Join now and challenge yourself with questions on:Construction processesSafety regulationsProject managementMaterials and methods","img":"https:/images/course3.png"}