Midterm+ch3

Which of the following diagram is NOT an structural diagram
A. Deployment diagram
B. Class Diagram
C. Component diagram
D. Sequence diagram
The implementation phase is often described as the most difficult part of the strategic management process. Issues central to implementing strategies include
A. Acquisition of new technology
B. Developing procedures
C.Adjusting organizational structure
If you construct a smart shopping system, system users said that they need a calendar to remind them about Black Friday date. This is a-, which should be specified in phase
A. Developer requirements, Design
B. Business requirements , Analysis
C. No answer is correct
D. Business requirements, Design
The users, managers, and key decision makers get to know the principle ideas about the new system via a meeting called
A. System design
B. System proposing
C. System steering committee
D. System walk-through
If an organization wants to make automatic accounting system, Technical feasibility study should be done to______
A. Check if changing to automatic accounting system should be done
B. Check if the employee accepts the changes to automatic system
C. Check if the system could be designed, implemented and installed properly.
D. All answers are correct
Behavioral diagrams include:
A. Activity diagrams.
B. Sequence diagrams.
C. Use case diagrams.
D. Deployment diagrams
E. Class diagrams.
Which elements are typically included in the system proposal? (Select all that apply)
A. Feasibility analysis
B. Workplan
C. Initial project request
D. Detailed requirements definition
E. User training manuals
F. functional models
G. Structural models
H. Behavioral models
What is the primary focus during the Elaboration phase of the project according to the RUP?
A. Construction and coding
B. Defining project scope and actors
C. Detailed use case specification and architectural decisions
D. Transitioning the product to end users
During the Elaboration phase, architectural decisions are made, and about 80% of essential requirements are identified.
True
False
The Inception phase focuses on building the product through coding iterations.
True
False
Project work-plan means______
A. All answers are correct
B. Develop the use case
C. Specify requirements
D. List all the project tasks in a table
The completion date of a project is predetermined and never changes.
True
False
Lower CASE tools support later activities such as programming, debugging testing
True
False
Upper CASE tools support later process activities of requirement and design
True
False
In the context of project management methodologies, which approach would be most suitable for a project with complex systems and unclear user requirements?
A. Waterfall
B. Phased
C. Prototyping
D. Throwaway Prototyping
For a project with unfamiliar technology and a short time schedule, which project management methodology is likely to be the most effective?
A. Parallel
B. Phased
C. Extreme Programming
D. Prototyping
E. Throwaway Prototyping
The most important step of the entire SDLC is:
A. Maintenance
B. Requirements determination
C. Design determination
D. Implementation
E. Modelling
Nonfunctional Requirements are:
A. Information the system must contain
B. Cultural properties the system must have
C. A process the system has to perform
D. The main functions of the system
E. Security properties the system must have
F. Operational properties the system must have
The system's business value to the organization is identified during:
A. Project initiation
B. Requirements gathering
C. Analysis phase
D. Project management
A use case diagram provides detailed information about the user interaction steps that take place within a use case.
True
False
The requirements definition is:
A. A document that lists the new system's functions.
B. A statement of characteristics the system must have.
C. A statement of what the system must do.
D. A statement of business requirements.
E. A statement of how the system will be implemented.
Which of the following RUP phases involves correcting problems, beta testing, user training, and conversion of the project?
A. elaboration
B. transition
C. inception
D. construction
Work Breakdown Structure (WBS) is a hierarchy of tasks that indicates_____
A. Task dependencies
B. The current status of each task
C. All answers
D. Duration of each task
Activity diagrams, use-case descriptions, and use-case diagrams are three different representations for the Select one:
A non-functional model
B. Design model
C. Architectural model
D. functional and non-functional model
E. functional model
The division of the Rational Unified Process (RUP) into phases and iterations corresponds to______
A. Static Structure
B. Dynamic Structure
C. Iterative Structure
D. Sequential Structure
The_________takes the general ideas in the system request and refines them into a detailed requirements definition.
A. All the above
B. Analysis phase
C. Testing Phase
D. Design phase
Is particularly important with Rapid Application Development (RAD) methodology
A. Ranking business requirements based on either priority or release version
B. No answer is correct
C. Ranking business requirements based on release version
D. Ranking business requirements based on priority
The needed elements for a successful project:
A. tool
B. stakeholder
B. notation
C. process
D. objectives
Methodology that are excellent for both short time schedule and schedule visibility
A. phased
B. Throw away prototyping
C. prototyping
D. waterfall
--------represents a separation of roles among objects
A. Fork Node
B. Swimlanes
C. Join Node
D. All answers are wrong
Feasibility analysis may be defined as a(n)_____.
A) assessment of ability of the ultimate users of the system to accept the system and incorporate it into the ongoing operations of the organization
E) none of these
D) identification of only the costs and benefits associated with the project
B) determination of the extent to which the system can be technically designed, developed, and installed
C) guide to determining whether to proceed with a project
The class diagram, and object diagram are types of_______diagram select the correct option:
A. No answer is correct
B. Both Structural and Structural
C. Behavioral
D. Structural
Nonfunctional requirements include____: select all the true choices
Performance
Operational requirements
Budget details
Development timeline
Security
Cultural and political
Select the items that form the system proposal:
A. Structural models
B. Staff Committee
C. The workolan
D. Project Manger
E. A detailed requirements definition
F. Feasibility analysis
G. Behavioral models
H. Functional models
What is a functional requirement?
A process the system has to perform
The hardware requirements for the system
The budget for the system development
Behavioral properties the system must have
Information the system must contain
The analysis phase of the SDLC answers which questions _____.
A) who will create the system and when will it be used
B) who will the system be for, what the system will do, when will it be used, and where will it be used
C) why build the system, what the system will be, and how the system will work
D) why build the system, who will the system be for, when will it be used, and how the system will work E) why build the system, who will the system be for, when will it be used, and where will it be used
If a "student signs up for a class," which type of relationship would you use to model the relationship between the two?
A) generalization
B) association
C) aggregation
D) subsetting
E) vague
The goal of the analysis phase in SDLC is:
A) To finalize the system design
B) To understand the requirements of the new system
C) To implement the new system
D) To maintain the current system
______is the final phase during which the system is actually built This phase has three steps: 1. Construct the system Build it (write the programming code) Test it 2. Install system Train the users 3. Support the system (maintenance)
The project plan is the document that is used to ___.
Describe how the project team will go about developing the proposed system
All of them
Summarize the business need and explain how the proposed system supports that need and creates value
 
 
{"name":"Midterm+ch3", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Which of the following diagram is NOT an structural diagram, The implementation phase is often described as the most difficult part of the strategic management process. Issues central to implementing strategies include, If you construct a smart shopping system, system users said that they need a calendar to remind them about Black Friday date. This is a-, which should be specified in phase","img":"https://www.quiz-maker.com/3012/images/ogquiz.png"}
Powered by: Quiz Maker