Risk Assessment Quiz

An operator assessing risks at a construction site, with machinery and safety equipment visible, showing focus and responsibility.

Risk Assessment Quiz

Test your knowledge and skills in risk assessment with our comprehensive quiz designed for operators and site managers. This quiz covers various scenarios to help you understand when to conduct different types of risk assessments during operations.

  • 11 Engaging Questions
  • Multiple Choice Format
  • Improve Your Safety Awareness
11 Questions3 MinutesCreated by AssessingSafety123
An operator is starting their shift and is about to commence a pre-start on their machine. What type of risk assessment is required?
No risk assessment
HIT
How-to-guide
Job Analysis (JA)
An excavator operator has just been asked to swap out of the excavator and enter the dozer to complete some clean-up work; they had completed a HIT for operating the excavator earlier on in the shift. What type of risk assessment is required?
No risk assessment
HIT
How-to-guide
Job Analysis (JA)
A new traffic control plan including windrows, parking bays and change in traffic flow needs to be constructed at the MSA. What type of risk assessment is required for the construction?
No risk assessment
HIT
How-to-guide
Job Analysis (JA)
A rear dump truck has become bogged on the haul road and requires to be towed out. What type of risk assessment is required?
No risk assessment
HIT
How-to-guide
Job Analysis (JA)
A crane has been brought to site to complete a lift. The lift is rated at 80% of its load chart capacity. What type of risk assessment is required?
No risk assessment
HIT
How-to-guide
Job Analysis (JA)
A worker is completing a pre-start on their machine and has already completed a HIT as well as applied their personal isolation lock. What type of risk assessment is required?
No risk assessment
How-to-guide
Job Analysis
An excavator operator was assigned the task of tidying up batters that had previously been undercut. What type of risk assessment is required?
No risk assessment
HIT
How-to-guide
Job Analysis (JA)
A drop cut is about to be commenced. What type of risk assessment is required?
No risk assessment
HIT
Job Analysis
The maintenance department have bought a new tool that is unlike another on site. They have completed change management and are ready to use the tool for the first time. What type of risk assessment is required?
No risk assessment
HIT
How-to-guide
Job Analysis (JA)
An excavator is about to start double benching within the pit and the material is not expected to be free rilling. What type of risk assessment is required?
No risk assessment
HIT
How-to-guide
Job Analysis (JA)
{"name":"Risk Assessment Quiz", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Test your knowledge and skills in risk assessment with our comprehensive quiz designed for operators and site managers. This quiz covers various scenarios to help you understand when to conduct different types of risk assessments during operations.11 Engaging QuestionsMultiple Choice FormatImprove Your Safety Awareness","img":"https:/images/course7.png"}