Chose
Software Development Quiz
Test your knowledge and understanding of software development methodologies, life cycle phases, and best practices with our comprehensive quiz! This engaging quiz consists of 59 carefully crafted questions that cover a range of topics within software engineering.
Challenge yourself and discover:
- Development phases and processes
- Best practices in software requirements
- Testing and validation techniques
In a classical waterfall model, which phase precedes the design phase?
Coding and unit testing
Maintenance
Requirements analysis and specification
Feasibility study
In the classical waterfall model during which phase is the Software Requirement Specification (SRS) document produced?
Design
Maintenance
Requirements analysis and specification
Coding
Among development phases of software life cycle, which phase typically consumes the maximum effort?
Requirements analysis and specification
Design
Coding
Testing
In a safety critical system, incorrect operation
Causes minor problems
Does not affect much
Causes major and serious problems
None of the mentioned
In which phase the system is changed in response to the customer needs?
Specification
Development
Evolution
Validation
In which phase the system is checked to do what the customer wants?
Validation
Specification
Evolution
Development
In which stage of system testing, the system is checked with customer data?
Review testing
Acceptance testing
Inspection testing
System testing
Which of the following process includes deploying an increment for use by the end user?
Incremental delivery
Prototyping development
RUP
Incremental development
9.Define Agile scrum methodology
Project management that emphasizes no progress
Project management that emphasizes incremental progress
Project management that emphasizes neutral progress
Project management that emphasizes decremental progress
What is the name of the applications that run on a local computer that is not connected to a network?
Embedded
Stand alone
Interactive transaction
Batch transaction
What does acceptability attribute of good software mean?
Software should not make wasteful use of system resources
Software must be understandable, usable, and compatible with other systems that they use.
Software can evolve to meet the changing needs of customers.
Malicious users should not be able to access or damage the system.
The phone billing systems and the salary payment systems are examples of ... systems
Business critical system
Safety critical system
Security critical system
Mission critical system
Which of the following document contains the user system requirements?
SRD
DDD
SDD
SRS
The challenge to develop flexible software techniques to cope with distributed systems across networks that include different types of computers and mobiles is the ... challenge
Security and trust
Business and social needs
Heterogeneity
All the above
In which step of SDLC actual programming of software code is done?
Development and Documentation
Maintenance and Evaluation
Design
Analysis
--------------Specification is also known as SRS document
White-box
Grey-box
Black-box
None of the mentioned
...is concerned with specifying the system, defining its overall architecture, and then integrating the different parts to create the finished system and less concerned with software.
Computer science
Software engineering
System engineering
Software
Actual programming of software code is done during which step in the SDLC.
Maintenance and Evaluation
Design
Analysis
Development and Documentation
Which of the following property does not correspond to a good Software requirements Specification (SRS)
Verifiable
Ambiguous
Complete
Traceable
Security assessment are
Experience-based validation
Tool-based validation
Tiger teams
All of the above
These are stand-alone systems that are produced by a development organization and sold on the open market to any customer who is able to buy them
Generic products
Bespoke products
Customized products
B and c
Which of the following is not generally considered a player in the software process?
Customers
End-users
Project managers
Sales people
The first step in project planning is to:
Determine the budget.
Select a team organizational model.
Determine the project constraints.
Establish the objectives and scope.
Software should not make wasteful use of system resources such as memory and processor cycles. This good characteristic is called ...
Maintainability
Dependability
Efficiency
Acceptability
is intended to show that a system conforms to its specification
Testing
Inspection
Verification
Validation
...is intended to show that a system conforms to the expectations of the system customer.
Testing
Inspection
Verification
Validation
A characteristic of a software system that can lead to a system error is known as?
Human error or mistake
System fault
System error
System failure
Which of the following are parameters involved in computing the total cost of a software development project?
Hardware and software costs
Effort costs
Travel and training costs
All of the mentioned
Agile Software Development is based on which of the following type? A.Iterative Development
Incremental Development
Both Incremental and Iterative Development
Linear Development
Iterative Development
Which factors should be considered in choosing the organizational structure for a software team?
Degree of communication desired
Predicted size of the resulting program
Rigidity of the delivery date
All of the above.
Effective software project management focuses on four P's which are:
People, performance, payoff, product
People, product, performance, process
People, product, process, project
People, process, payoff, product
One of the best ways to avoid frustration during the software development process is to
Give team members less control over process and technical decisions.
Give team members more control over process and technical decisions.
Reward programmers based on their productivity.
Hide bad news from the project team members until things improve.
The quality assurance process involves taking responsibility for quality throughout the project's life cycle.
True
False
Validated changes and validated deliverable are the outputs of the quality assurance process.
True
False
Testing is intended to hide which a program does intended to do and to discover program defects before it is put into use.
True
False
A Scrum Master is a team leader and facilitator who helps the team members to follow agile practices so that they can meet their commitments.
True
False
Software reliability is the probability of failure operation of a computer program for a specified period in a specified environment
True
False
Safety-critical systems A system whose success may result in injury, loss of life or serious environmental damage
True
False
Tiger teams Is a team is set up and given the objective of breaching the system security. They neglect attacks on the system and use their ingenuity to discover new ways to compromise the system security
True
False
Test-driven development (TDD) is an approach to program development in which your inter-leave testing and code development
True
False
Agile is a software development methodology to build a software incrementally using short iterations of one to four weeks so that the development is aligned with the changing business needs.
True
False
.The risk-driven specification process involves understanding the risks faced by the system discovering their root causes and generating requirements to manage these risks.
True
False
.Selenium Remote Control helps create complex and advanced automation scripts.(T)
True
False
The best person to hire as a project team leader is the most competent software engineering practitioner available.
True
False
Project management is less important for modern software development since most projects are successful and completed on time.
True
False
.Organizations that achieve low levels of maturity in people management have a higher likelihood of implementing effective software engineering processes.
True
False
Agile processes must not be adapted incrementally to manage unpredictability.
True
False
Agile development stresses continuous communication and collaboration among developers and customers’.
True
False
Agile development processes can deliver successful systems quickly.
True
False
Using Six Sigma principles is an organization-wide commitment and all employees must embrace its principles.
True
False
A run chart is a bar graph that depicts data points and their order of occurrence.
True
False
Products that are accepted by project stakeholders are considered to be validated deliverables.
True
False
A critical system is a system which must be highly reliable and not retain this reliability as they evolve without incurring prohibitive costs.
True
False
Security specification and security management are essential for all critical systems
True
False
Only in-house auditors can perform quality audits.
True
False
Project managers are ultimately responsible for quality management on their projects.
True
False
Software quality product is defined in term of its fitness of purpose.
True
False
Reliability is the ability of a product or service to perform as expected under deviant conditions
True
False
Customer requirements are an important aspect of the quality planning process.
True
False
{"name":"Chose", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Test your knowledge and understanding of software development methodologies, life cycle phases, and best practices with our comprehensive quiz! This engaging quiz consists of 59 carefully crafted questions that cover a range of topics within software engineering.Challenge yourself and discover:Development phases and processesBest practices in software requirementsTesting and validation techniques","img":"https:/images/course6.png"}
More Quizzes
Measure
6030145
SOFTWEAR FINAL
60300
App prefinals 06
1168
Software Engineering
542764
Software Development Lifecycle Quiz
281430
SE (UNIT 2-TOPIC 1)
11612
Non-Project Manager Quiz
6328
Non-Project Manager Quiz
6330
Tool Support for Testing
10521
ACN Bootcamp Agile vs Waterfall quiz
8421
ISTQB - Test Management
9425
Selenium Quiz
1050