2018 - FAA Order 6032.1E

1. Modifications can be issued using an:
A. STR
B. EEM
C. SSM
D. SDR
E. All of the above
2. Which of the following is not a reason to issue a modification?
A. Address part obsolescence/availability
B. Increase manpower requirements
C. Minimize safety hazards
D. Facilitate maintenance
E. Enable commissioning/decommissioning
F. None of the above
3. Time Critical Modifications must complete installation no later than ___ days from the modification release date.
A. 180 days
B. 90 days
C. 30 days
4. Who is responsible for coordinating and scheduling the selected key site location for testing and verification activities?
A. SSC Manager
B. Technical Operation Manager
C. Modification OPR
5. What must be obtained if a modification changes the baseline hardware, software, firmware configuration or functional operation of a system in NAS-MD-001?
A. Signed LOA
B. Signed MOA
C. Signed CCD
6. NAS Modification Program policy defines a modification as any change to either:
A. The authorized National or Service Area standard configurations
B. The functional capabilities of commissioned facilities, systems, equipment, plant, or structures in the NAS under configuration management
C. Software updates that change the National baseline
D. All of the above
7. Guidance for issuing SSDs and EEMs can be found in Order JO ____.
A. 1320.58
B. 1320.1
C. 1100.157
8. Which of the following is not a type of testing and verification?
A. Directive Verification
B. Developmental Test
C. Modification Test
D. Emergency Verification
9. Notices may be used to authorize safety modifications. What must they include?
A. Issuing a more permanent authorization if the safety modification becomes permanent
B. Status accounting information
C. Both A and B
D. None of the above
10. A ____ test is installation of a hardware or software modification that has completed development and/or system test to assess the final National configuration functions in an operational system environment with the NAS system is in or out of service.
A. Developmental
B. Modification
C. Directive Verification
This will link you to the quiz PDF in the Documentation Quizzes Library:
http://nas.amc.faa.gov/phoenix/directDownload?db=dms&id=5917
This will link you to the quiz PDF in the Documentation Quizzes Library:
http://nas.amc.faa.gov/phoenix/directDownload?db=dms&id=5917
{"name":"2018 - FAA Order 6032.1E", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"1. Modifications can be issued using an:, 2. Which of the following is not a reason to issue a modification?, 3. Time Critical Modifications must complete installation no later than ___ days from the modification release date.","img":"https://www.quiz-maker.com/3012/images/ogquiz.png"}