Well Control

Where is a production packer normally positioned in the well?
Close to the tubing hanger
Half way between the tubing hanger and the perforations
Above the top perforations
Below the bottom perforations
Before starting work on a new well, you are handed a well program with no signatures or sign-offs. What action should you take?
Hold a pre-job meeting
Alert your supervisor and do not start the job
Check the program and continue if it appears OK
Start the job and discuss the approval as it continues
What does “positive plug” mean?
It prevents flow from above
It prevents flow from below
It prevents flow from both directions
What does the term “inflow test” mean for plug?
Applying pressure above a plug
Applying pressure below a plug
Bleeding off pressure above a plug
Equalising pressure across a plug
Do kicks always occur following total losses?
Yes, kicks will always occur in this situation
No, it depends on the mud viscosity
No, it depends on how much the mud level drops in the annulus
When tripping in the hole, mud returns to the trip tank are less than calculated. Once back drilling, the return flow is less than expected. What is the most likely cause of this?
Swabbing
A kick
Total losses
Partial losses
Why is it important to shut the well in quickly if a kick is detected?
Keep kick volume as small as possible
Prevent gas migration
Keep SIDPP as small as possible
{"name":"Well Control", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Where is a production packer normally positioned in the well?, Before starting work on a new well, you are handed a well program with no signatures or sign-offs. What action should you take?, What does “positive plug” mean?","img":"https://www.poll-maker.com/3012/images/ogquiz.png?sz=1200-00000000001000005300"}
Powered by: Quiz Maker