Fundamentals of testing practice test

Create an illustration of a person sitting at a desk surrounded by computer screens displaying software testing tools and flowcharts, emphasizing a professional testing environment, bright and engaging colors, modern technology feel.

Fundamentals of Testing Quiz

Test your knowledge of fundamental testing processes with this engaging quiz. Whether you're a student, an aspiring tester, or a professional looking to refresh your skills, this quiz covers essential concepts that every software tester should understand.

Join in and discover your testing expertise!

  • 11 thought-provoking questions
  • Feedback on your answers
  • Improve your understanding of testing fundamentals
11 Questions3 MinutesCreated by TestingEagle542
Through activities in the Fundamental test, process may overlap or occur concurrently, identify the logical sequential process.
(i) Test Implementation and Execution
(ii) Test Closure activities
(iii) Evaluating exit criteria and reporting
(iv) Test Planning and Control
(v) Test Analysis and Design
iv – v – iii – ii – I
v – I – iii – ii – iv
iv – v – I – iii – ii
v – ii – iii – I – iv
A deviation from the specified or expected behaviour that is visible to end-users is called:
An error
A fault
A failure
A defect
What is the USUAL sequence for performing the following activities during the Fundamental Test Process?
a. Analyse the test basis documents.
b. Define the expected results.
c. Create the test execution schedule.
d. Establish the traceability of the test conditions
D, a, c, b
A, d, b, c
A, b, c, d
A, b, d, c
What is the process of analysing and removing causes of failures in software?
Validation
Testing
Debugging
Verification
During which activity of the Fundamental Test Process do you review the test basis?
Evaluating exit criteria and reporting.
Test implementation and execution
Test analysis and design
Test planning and control
When do you stop testing?
When the specified number of faults are found.
When the test completion criteria are met.
When all high and medium priority tests are complete.
When all statements have been executed.
Which is not the fundamental test process
Planning and control
Test closure activities
Analysis and design
Requirement Analysis
Which of the following MAIN activity is part of the fundamental test process?
Initiating and planning
Documenting root-causes
Capturing lessons learned
Planning and control
Which of the following is false?
In a system, two different failures may have different severities.
A fault need not affect the reliability of a system.
Undetected errors may lead to faults and eventually to incorrect behaviour.
A system is necessarily more reliable after debugging for the removal of a fault.
During which test activity could faults be found most cost effectively?
Execution
Design
Planning
Check Exit criteria completion
{"name":"Fundamentals of testing practice test", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Test your knowledge of fundamental testing processes with this engaging quiz. Whether you're a student, an aspiring tester, or a professional looking to refresh your skills, this quiz covers essential concepts that every software tester should understand.Join in and discover your testing expertise!11 thought-provoking questionsFeedback on your answersImprove your understanding of testing fundamentals","img":"https:/images/course8.png"}
Powered by: Quiz Maker