11. Capital cost of a gas turbine plant is _________ than that of a steam power plant of same capacity.
same
lower
higher
none
12. Water hammer is developed in a ____________
penstock
draft tube
. turbine
. surge tank
13. The function of a surge tank is ____________
to supply water at constant pressure
to produce surges in the pipe line
. to relieve water hammer pressures in the penstock pipe
none of the above
14. Operating charges are minimum in the case of ________ for same power output .
gas turbine plant
hydel plant
thermal plant
nuclear plant
15. Location of the surge tank in a hydro electric station is near to the ____________
tailrace
turbine
reservoir
none of the above
16. Running cost of a hydro-electric power plant is ____________
equal to running cost of a steam power plant
less than running cost of a steam power plant
more than running cost of a steam power plant
none of the above
17. _______ is the most commonly used as moderator
graphite
sodium
copper
heavy water
18. The function of the moderator in a nuclear reactor is to ___________
stop chain reaction
. absorb neutrons
. reduce the speed of neutrons
. reduce temperature
19. The function of a solar collector is to convert __________
. solar energy into electricity
solar energy into radiation
solar energy into thermal energy
none of the above
20. Most widely used material of a solar cell is ___________
arsenic
cadmium
silicon
steel
0
{"name":"GENERATION OF ELECTRICAL POWER- 2", "url":"https://www.quiz-maker.com/QERFX3GN","txt":"11. Capital cost of a gas turbine plant is _________ than that of a steam power plant of same capacity., 12. Water hammer is developed in a ____________, 13. The function of a surge tank is ____________","img":"https://www.quiz-maker.com/3012/images/ogquiz.png"}