51. In the design of a large shopping centers where space is required, intervals of columns can be wider than the ordinary by adopting a structural method of construction called
Compression
Post-tensioning
Pre-casting
52. Heat gain through the structure of a habitable room occurs in tropical region at walls and roofs by conduction. This can be minimized by?
Wood
Concrete
Steel
A narrow strip of wood applied to cover a joint along the edges of two parallel boards in the same plane is a
Fillet
stirrup
Batten
54. The stressing of unbounded tendons after concrete has cured is
Post-tensioning
Pre-casting
Lift slab
55. A window which projects outside the main line of a building and the compartment in which it is located extends to the floor is known as
Bay window
Hopper window
Oriel window
56. A form of brick bond in which each course is alternately composed of entirely of headers or of stretchers is known as
Common bond
Flemish bond
English bond
57. An iron alloy usually including carbon and silicon which has high compressive strength but low tensile strength is
Pig iron
cast iron
Wrought iron
58. The Filipino term for plastered course is
Lastilyas
Monyeka
Kusturada
59. The Filipino term for bottom chord is
Barakilan
Sibe
Estunyo
60. The Filipino term for perlin is
. Tahilan
. balangkas
. reostra
61. The Filipino term for eave is
Sepo
Tabike
Sibe
62. The Filipino term for top chord is
Tahilan
Barakilan
sinturon
63. Plaster or plywood ceiling on nailers or joists below a ventilated roof space may show “pattern staining” on the ceiling. This can be prevented by
Cleaning
Adequate insulation
Re-painting
64. Dry walls are customarily finished with
Lath and plaster
mortar and chb
Reinforced concrete
65. A typical block or panel type insulating material used in flat roof of commercial or industrial building
Corkboard
Acacia lumber
Washed pebbles
66. A ferrous metal that offers great resistance to abrasion and finds important use in the cutting edges of heavy digging tools is a
Alloy
Nickel
Manganese
67. A building stone of igneous origin and composed of quartz, hornblende and mica is a
Travertine
Serpentine
granite
68. The Filipino term for rabbet
Palitada
Asintada
Vaciada
69. The Filipino term for projection is
Alahado
Bolada
Asinta
70. A geological or ground condition considered in determining the size and type of foundation of the building
Soil chemistry
Soil bearing pressure
Particle size distribution
71. These are materials excellent as vapor barrier in the roofing system of residential buildings
Particle board
Lawanit board
Aluminum foil sheets
72. The chief structural materials, used for tall buildings are
Built-up beams, girders, foundations
Cement, gravel and sand
RC and high grade steel
73. These are classified as good and less expensive insulating materials used in buildings
Glass blocks, 5000 psi concrete
Porous concrete, glass fibers
Steel plates, marble slabs, granite
74. This is a material that holds less moisture, is very light, less water absorptive capacity and is very good in sidings of dwelling units
Vinyl shingles
Asbestos-cement shingles
Wood boards
75. The finished frame surrounding a door is a
Door frame
Door jamb
Door casing
76. A door lock with a spring bolt controlled by one or both knobs and dead bolt controlled by a key is a
Knob bolt
knob latch
Knob lock
77. A door consisting of two separate leaves, one above the other, this leaves may operate independently or together is a
Dwarf door
Dutch door
window door
78. A clay roofing tile approximately semi cylindrical in shape laid in courses with units having their convex side alternately up and down is a
Pantile
Mission tile
Roman tile
The Filipino term for baseboard is
Rodapis
Pergola
Batidura
80. The most common materials used for roofing of urban residential houses
Rc slab
Wood shingle
GI sheet
81. A continuous recess built into a wall to receive pipes, ducts, etc. Is called
Alcove
Ductwork
Chase
82. A twisting force is
Torsion
Shear
Moment
83. A barrier or diaphragm formed to prevent the movement of soil to stabilize foundation, etc. is
Pile foundation
Sheet piling
Retaining wall
84. The Filipino term for floor joist is
Suelo
Guililan
Soleras
85. Standard concrete mix for beams, girders, slabs, stairs and columns is
AA
A
B
86. A system of framing a building in which the studs are continuous to roof supporting second floor joints is known as?
Balloon framing
Western framing
Platform framing
87. A specialized fastener used to pull on to hold mitered joints together is
bolt
Wood screw
Clamp nail
88. Rafters laid diagonally from corner of a plate or girts to the ridge
Jack rafter
Valley plate
Hip rafter
89. Columns in which a concrete core is reinforced with a steel or cast-iron core designed to support a part of load is
Cast-in-place
Composite
Post tension
90. The Filipino term for ceiling joist is
Kostilyahe
Tirante
Espejo
91. The Filipino term for beam is
Biga
Sepo
Kilo
Instrument or tool capable of vertical and horizontal line check is called
Plumb bob
Spirit level
T square
93. When the ratio of short span to the long span of a slab is less than 0.50, slab is a
One-way slab
Slab on fill
Two-way slab
94. Longitudinal beams which rest on the top chord and preferably at the joints of the truss
Purlin
Rafter
Girder
95. Concrete slab should have a minimum clearance of
20mm
40mm
15mm
96. What is the appropriate painting material type for wood surfaces?
Polyurethane
Latex
Zinc chromate
97. The time required for the removal of a form works of a concrete footing
24 hours
36 hours
48 hours
98. Wall partition wooden framing is called
Joist
Jamb
Stud
99. A type of concrete floor which has no beam is called
Flat slab
2-way slab
Ribbed floor
100. The major horizontal supporting member of the floor system is called
Rafter
Girder
Girt
{"name":"BTECH REVIEWER PART 4", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Test your knowledge and skills in the field of construction and architecture with our comprehensive BTECH Review Quiz.This quiz is designed for students and professionals alike, covering a variety of topics including structural materials, Filipino terminology, and construction methods. It consists of 50 questions to challenge your understanding.50 Multiple Choice QuestionsFocus on Construction and Design PrinciplesSuitable for Students and Professionals","img":"https:/images/course2.png"}
More Quizzes
Second year
158121
Hydraulics and Geotechnical Engineering
1588
EQS 3233 Construction & Project Management
7420
POP QUIZ
5239
Substructures
9420
Quiz 2
10521
CE227 MODULE 6A
13624
Strength of Materials Quiz
105199
EMAR102: Materials Test 2
10575
JERCELL
331638
Engineering management Group 6
10516
EMAR102: Materials Test 1
10570