PROFESSIONAL PRACTICE IMHOTEP 1

A colorful infographic illustrating various aspects of professional architectural practice, including images of buildings, blueprints, and architects at work.

Professional Practice Imhotep 1 Quiz

Test your knowledge on professional practice in architecture with our comprehensive quiz. Dive into various topics related to specialized allied services, compensation methods, recommended professional fees, and much more.

  • 54 thought-provoking questions
  • Multiple choice format for easy understanding
  • Perfect for architecture students and professionals alike
54 Questions14 MinutesCreated by DesigningStone42
Interest rate per annum in case of incomplete / non-payment (UAP DOC 203)
1%
2%
3%
4%
SPECIALIZED ALLIED SERVICES: Arch’l. Interior
10% to 15% x Cost of Work (coordination fee 5% x Cost of Work)
10% to 15% x Cost of Work (average =12%, coordination fee 5% x Cost of Work)
Preparation of Detailed Engineering Drawings and Specifications on roads, drainage, sewerage, power, communication system and additional fee to be charged by the Architect 4% x Development Cost of the Project
30% of the Fee
METHOD OF COMPENSATION: Physical Planning
10% to 15% x Cost of Work (coordination fee 5% x Cost of Work)
10% to 15% x Cost of Work (average =12%, coordination fee 5% x Cost of Work)
Preparation of Detailed Engineering Drawings and Specifications on roads, drainage, sewerage, power, communication system and additional fee to be charged by the Architect 4% x Development Cost of the Project
30% of the Fee
METHOD OF COMPENSATION: Acoustics
10% to 15% x Cost of Work (coordination fee 5% x Cost of Work)
10% to 15% x Cost of Work (average =12%, coordination fee 5% x Cost of Work)
Preparation of Detailed Engineering Drawings and Specifications on roads, drainage, sewerage, power, communication system and additional fee to be charged by the Architect 4% x Development Cost of the Project
30% of the Fee
METHOD OF COMPENSATION: .Landscape
10% to 15% x Cost of Work (coordination fee 5% x Cost of Work)
10% to 15% x Cost of Work (average =12%, coordination fee 5% x Cost of Work)
Preparation of Detailed Engineering Drawings and Specifications on roads, drainage, sewerage, power, communication system and additional fee to be charged by the Architect 4% x Development Cost of the Project
30% of the Fee
MODE OF PAYMENTS: 20% of the Fee
Upon Submission of Preliminary Design
Upon Submission of Final Design
Upon Completion of the Project
10% to 15% x Cost of Work (coordination fee 5% x Cost of Work)
30% of the Fee
Upon Submission of Preliminary Design
Upon Submission of Final Design
Upon Completion of the Project
10% to 15% x Cost of Work (coordination fee 5% x Cost of Work)
Upon Submission of Final Design
20% of the Fee
50% of the Fee
30% of the Fee
10% to 15% x Cost of Work (coordination fee 5% x Cost of Work)
The Recommended Professional Fee (RPF) is Php 50,000.00 per hectare for the first five (5Has) hectares net to the Architect.
METHOD OF COMPENSATION
MODE OF PAYMENTS
PHYSICAL PLANNING FOR BUILDING SITES such as INDUSTRIAL ESTATES, COMMERCIAL, RELIGIOUS, INSTITUTION & GOVERNMENT
NOTA
What is the RECOMMENDED PROFESSIONAL FEE (RPF) if the AREA is Over 50 hectares and above?
P4.00 per sq. meter
P3.00 per sq. meter
P2.00 per sq. meter
P1.50 per sq. meter
What is the AMOUNT if the AREA is Over 5 hectares up to 10 hectares?
P1,650,000.00 + P15,000.00 per hectare in excess of 50 hectares
P450,000.00 + P30,000.00 per hectare in excess of 10 hectares
P250,000.00 + P40,000.00 per hectare in excess of 5 hectares
P250,000.00
RECOMMENDED PROFESSIONAL FEE (RPF) of Basic rate for the first 5 hectares or less (1 hectare : 10,000 sq.meters) area
P1.50 per sq. meter
P3.00 per sq. meter
P4.00 per sq. meter
P5.00 per sq. meter
P250,000.00 amount = area?
Over 10 hectares up to 50 hectares
Over 5 hectares up to 10 hectares
Basic rate for the first 5 hectares or less (1 hectare : 10,000 sq.meters)
Basic rate for the first 2.5 hectares or less (1 hectare : 10,000 sq.meters)
P4.00 per sq. meter RECOMMENDED PROFESSIONAL FEE (RPF) = AREA?
Over 5 hectares up to 10 hectares
Over 7 hectares up to 10 hectares
Over 10 hectares up to 10 hectares
Over 5 hectares up to 12 hectares
P250,000.00 + P40,000.00 per hectare in excess of 5 hectares is the amount = area?
Over 5 hectares up to 10 hectares
Over 7 hectares up to 10 hectares
Over 10 hectares up to 10 hectares
Over 5 hectares up to 12 hectares
Over 10 hectares up to 50 hectares AREA, what is the RECOMMENDED PROFESSIONAL FEE (RPF)?
P4.50 per sq. meter
P4.00 per sq. meter
P3.00 per sq. meter
P2.00 per sq. meter
RECOMMENDED PROFESSIONAL FEE (RPF) P3.00 per sq. meter = amount?
P1,500,000.00 + P15,000.00 per hectare in excess of 50 hectares
P1,250,000.00 + P15,000.00 per hectare in excess of 50 hectares
P1,650,000.00 + P15,000.00 per hectare in excess of 50 hectares
P450,000.00 + P30,000.00 per hectare in excess of 10 hectares
RECOMMENDED PROFESSIONAL FEE (RPF) P1.50 per sq. meter = amount?
P1,350,000.00 + P15,000.00 per hectare in excess of 50 hectares
P1,450,000.00 + P15,000.00 per hectare in excess of 50 hectares
P1,250,000.00 + P15,000.00 per hectare in excess of 50 hectares
NOTA
RECOMMENDED PROFESSIONAL FEE (RPF) P1.50 per sq. meter = area?
Over 55 hectares and above
Over 50 hectares and above
Over 25 hectares and above
Over 20 hectares and above
The rate stipulated above is based on the assumption that the land to be developed is moderately flat. However, if the land is rugged with steep terrain the fee shall increase by
10% to 30%
25% to 35%
20% to 30%
10% to 20%
CONSTRUCTION SERVICES: minimum CONSTRUCTION MANAGER
1.5%
1.0%
2.0%
2.5%
Maximum FULL TIME SUPERVISION
2.5%
2.0%
1.5%
1.0%
Maximum PROJECT MANAGER
2%
3%
4%
5%
3.0% maximum of? (CONSTRUCTION SERVICES)
Full time Supervision
Construction Manager
Project Manager
Government Employee
1.5% of PCC & not more than _ of Annual Salary (Government Employee As Architect-of-Record (AoR) INCENTIVE PAY TO COVER CIVIL LIABILITIES)
40%
45%
50%
55%
MANAGEMENT FEE (UAP DOC 205)
4.0% - 6.0%
4.0% - 5.0%
6.0% - 7.0%
3.0% - 4.0%
UAP DOC 207 DESIGN-BUILD SERVICES With Guaranteed Maximum Project Construction Cost
20% + RDS Fee
10% + RDS Fee
5% + RDS Fee
15% + RDS Fee
7% DESIGN-BUILD SERVICES
DESIGN-BUILD SERVICES With Guaranteed Maximum Project Construction Cost
COMPETITION SERVICES With Guaranteed Maximum Project Construction Cost
DESIGN-BUILD SERVICES By Administration
NOTA
Interest rate per annum in case of incomplete / non-payment
4%
3%
3.5%
2%
PHYSICAL PLANNING FOR BUILDING SITES such as INDUSTRIAL ESTATES, COMMERCIAL, RELIGIOUS, INSTITUTION & GOVERNMENT: AMOUNT P250,000.00 + _____ per hectare in excess of 5 hectares
P45,000.00
P40,000.00
P10,000.00
P25,000.00
P450,000.00 + ___ per hectare in excess of 10 hectares
P40,000.00
P30,000.00
P10,000.00
P20,000.00
P1,650,000.00 + P15,000.00 per hectare in excess of 50 hectares
P10,000.00
P20,000.00
P40,000.00
P15,000.00
Preparation of Detailed Engineering Drawings and Specifications on roads, drainage, sewerage, power, communication system and additional fee to be charged by the Architect __ x Development Cost of the Project
2%
3%
4%
5%
Basic rate for the first 5 hectares or less (1 hectare : ___ sq.meters)
15,000
15,500
20,000
10,000
IRR OF RA 9266: RULE 5
Practice of Architecture
Examination, Registration and Licensure
Title, Policy Statement, Definition of Terms and Scope of Practice
Final Provisions
Professional Regulatory Board of Architecture (PRBOA) Organization, Powers and Function
Rule 1
Rule 2
Rule 3
Rule 4
Section 12-24 falls to?
Rule 5
Rule 4
Rule 3
Rule 2
Practice of Architecture?
4 - 12 section
39 - 47 section
12 - 25 section
25 - 39 section
Section 4 - 11
Practice of Architecture
Examination, Registration and Licensure
Professional Regulatory Board of Architecture (PRBOA) Organization, Powers and Function
Tle, Policy Statement, Definition of Terms and Scope of Practice
Rule 4
Examination, Registration and Licensure
Practice of Architecture
Professional Regulatory Board of Architecture (PRBOA) Organization, Powers and Function
Final Provisions
Maximum years Violation of IRR of RA9266
3
15
6
10
Minimum PHP Violation of IRR of RA9266
PHP 50,000
PHP 100,000
PHP 150,000
PHP 200,000
Maximum PHP Violation of IRR of RA9266
PHP 5,000,000
PHP 4,000,000
PHP 6,000,000
PHP 1,000,000
Minimum years Violation of IRR of RA9266
1 year
6 months
2 years
3 months
Any HEAD OF GOVERNMENT AGENCY OR OFFICER(S) of a Private Firm / institution who violates – sub-paragraph of RA. No. 8981
Min PHP 60,000
Min PHP 50,000
Max PHP 100,000
Max PHP 200,000
Any HEAD OF GOVERNMENT AGENCY OR OFFICER(S) of a Private Firm / institution who violates – sub-paragraph of RA. No. 8981
Min PHP 60,000
Min PHP 70,000
Max PHP 500,000
Max PHP 400,000
Any HEAD OF GOVERNMENT AGENCY OR OFFICER(S) of a Private Firm / institution who violates – sub-paragraph of RA. No. 8981
6 months + 1 day minimum
5 months + 3 days minimum
15 years maximum
10 years maximum
Any HEAD OF GOVERNMENT AGENCY OR OFFICER(S) of a Private Firm / institution who violates – sub-paragraph of RA. No. 8981
5 months + 1 day minimum
5 months + 3 days minimum
6 years maximum
15 years maximum
Without first executing a written CONTRACT/SERVICE AGREEMENT
Not less than PHP100,000
Not less than PHP200,000
Not more than PHP300,000
Not more than PHP200,000
Without first executing a written CONTRACT/SERVICE AGREEMENT
Not exceeding 4 years
Not exceeding 5 years
Not exceeding 6 years
Not exceeding 15 years
Any HEAD OF GOVERNMENT AGENCY OR OFFICER(S) of a Private Firm / institution who violates – sub-paragraph of RA. No. 8981
PHP 40,000 min
PHP 25,000 min
PHP 30,000 min
PHP 50,000 min
Any HEAD OF GOVERNMENT AGENCY OR OFFICER(S) of a Private Firm / institution who violates – sub-paragraph of RA. No. 8981
Maximum PHP 250,000
Maximum PHP 500,000
Maximum PHP 300,000
Maximum PHP 400,000
Any HEAD OF GOVERNMENT AGENCY OR OFFICER(S) of a Private Firm / institution who violates – sub-paragraph of RA. No. 8981
6 months + 1 day
5 months
6 months
5 months + 1 day
Any HEAD OF GOVERNMENT AGENCY OR OFFICER(S) of a Private Firm / institution who violates – sub-paragraph of RA. No. 8981
3 years
4 years
5 years
6 years
{"name":"PROFESSIONAL PRACTICE IMHOTEP 1", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Test your knowledge on professional practice in architecture with our comprehensive quiz. Dive into various topics related to specialized allied services, compensation methods, recommended professional fees, and much more.54 thought-provoking questionsMultiple choice format for easy understandingPerfect for architecture students and professionals alike","img":"https:/images/course8.png"}
Powered by: Quiz Maker