The insulation monitoring device test is passed if
IMD shutdown the TS within 30sec after insertion of test resistor between TSMP and ground
IMD does not shutdown the TS within 30sec after insertion of test resistor between TSMP and ground
IMD shutdown the TS within 30sec after insertion of test resistor between TS+ and TS-
The following symbol consisting of a red spark on a white-edged blue triangle must be affixed in close proximity
To the BSPD
To the inertia switch
To each shutdown button
The maximum number of team members from a team that can participate at formula bharat 2021 is
15
45
40
In EV's the following is not true for overcurrent protection devices
All overcurrent protection devices must be rated for the highest voltage in the system they protect, all devices used must be rated for AC
The overcurrent protection must be designed for the expected surrounding temperature range but at least for 0degrees Celsius to 85degrees celsius
All electical systemms must have appropriate overcurrent protection
Which of the following statements are false about the HVD ?
No tools must be necessary to open the HVD.
Remove actuation of the HVD through a long handle, rope or wire is permitted.
An untrained person must be able to remove the HVD withing 10 seconds when the vehicle is in ready-to- race condition.
Which of the following is valid for the Datalogger?
Datalogger must be supplied from a additional battery.
Data logger must be inserted in the Negative TS Supply between the most negative AIR (s) and invertor.
Datalogger can be placed within the accumulator container.
If the following flag is waved during a track event, it indicates that the driver must into the passing zone.
Blue flag with white dot
Black flag with orange dot
Blue flag
Which of the following is true regarding the accumulator segment.
Maximum static voltage of 200 V DC
Minimum energy of 6 MJ
Maximum mass of 12 kg.
Which of the following is a false statement
TS Accumulator Container Hand Cartmust have at least four wheels.
The data logger must not be placed within the accumulator container.
At least three AIRs must be fitted inside each accumulator container.
The TSAL must be
Be GREEN in color and flash continuously with a frequency between 2 Hz and 5 Hz if the TS is active and the LVS is switched off.
Be RED in color and continuously illuminated if the TS is deactivated and the LVS is switched on.
Be no lower than 150mm from the highest point of the main hoop.
Which of the following is false
The sound level of ready to drive sound must be a minimum of 80 dBA and a maximum of 90 dBA
Accumulator Management signals signals are System Critical Signals
The shutdown circuit is defined as a series connection of at least two master switches, three shutdown buttons, the IMD, the inertia switch, the BSPD, all required interlocks and the AMS.
The following basic tools must be presented during accumulator inspection:
Insulated cable shears and screw drivers
Multimeter with protected probe tips and two 4 mm banana plug test leads rated for 1000 V CAT III or better
Two HV insulating blankets of at least 1.0 m2 each
All the above
Which of the following is true for the rain test
The vehicle must not be in ready-to-drive mode
The test is passed if the if the shutdown circuit does not open while water is sprayed at the vehicle for 120s and 120s after the water spray has stopped.
Driven wheels need not to be removed.
How many points are awarded to every team that finishes endurance
120
50
25
None of the above
Which of the following abbrevation is false
TSMP Tractive System Measuring point
TSMS Tractive System Master Switch
IMD Insulation measuring Device
{"name":"Mock quiz", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Test your knowledge on the safety protocols and regulations associated with electric vehicles and their components. This quiz is designed for team members, enthusiasts, and anyone interested in understanding the critical aspects of EV safety.16 challenging questionsMultiple choice formatPerfect for teams participating in events like Formula Bharat","img":"https:/images/course8.png"}
Powered by: Quiz Maker