WCM NEWSLETTER QUIZ

Create an image depicting a team of factory workers discussing metrics and strategies to enhance production efficiency, with charts and graphs showcasing WCM principles in a modern manufacturing environment.

WCM Newsletter Quiz

Test your knowledge and understanding of the World Class Manufacturing (WCM) principles and practices as they apply to our organization. This quiz is designed for employees to assess their grasp of key concepts and metrics related to WCM.

Prepare for a range of topics, including:
- Bronze audit scores
- Value-added time in OEE systems
- Major components impacting WCM savings

12 Questions3 MinutesCreated by EngagingEngineer245
Name :
Employee ID :
How much Score we got in Bronze audit 1)------------ with 2)-------- Gap’s.
1) 46 2) 2
1) 45 2) 4
1) 46 2)3
1) 45 2)2
In furnace , Under ------------------------time basis, Online Surface load will get calculated.
Quenching
Heating
Loading
Unloading
Which time will be accounted as Value added time in online OEE Systems of IGU & TPS -----------------.
Sealing Time
Washing Time
Frame Fixing and Inspection Time
Pressing Time
What is the % of WCM Savings planned for 2020 ---------------.
2.8
3.2
3.7
2.5
What is the Maximum marks that your zone can get in 5S Audit ------------------.
What is Downstream Downtime 1)------------------------ and Upstream Downtime 2) ------------------ in online OEE calculation.
Total Time lost in the pressing machine and after pressing machine
Total Time lost before pressing machine and after pressing machine
Total Time lost after pressing machine and before pressing machine
Total Time lost in the pressing machine and before pressing machine
The Bronze Award we won was 1) ---------------------(Nth ) amongst Saint-Gobain Worldwide 2)--------------------- (Nth) amongst SG India and 3)----------------- (Nth) amongst SG Glass Solutions.
1)117 2)16 3)3
1) 115 2)17 3)2
1)113 2)17 3)2
1)115 2)16 3)3
In Overall Plant, what are the 2 Major Components which gave negative impact on the Plant WCM savings 2019 1)--------------- & 2)-------------------.
Sealant and PVB Yield
Glass and Gel Yield
Energy and Breakdown
Glass and External claims
What was the New Investment made in our Plant 2019 -----------------.
What is R25 1)---------------- , R05 2)---------------------.
Glass cost and PVB cost
Manufacturing cost and Gross Sales value
Manufacturing cost and Net profit
Depreciation cost and Gross Sales value
{"name":"WCM NEWSLETTER QUIZ", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Test your knowledge and understanding of the World Class Manufacturing (WCM) principles and practices as they apply to our organization. This quiz is designed for employees to assess their grasp of key concepts and metrics related to WCM.Prepare for a range of topics, including:- Bronze audit scores- Value-added time in OEE systems- Major components impacting WCM savings","img":"https:/images/course4.png"}
Powered by: Quiz Maker