Quality Management Quiz

Test your knowledge on quality management concepts and practices with our comprehensive quiz. Designed for professionals in the field, this quiz will cover essential topics related to ISO standards, quality assurance, and effective teamwork.

You'll encounter questions on:

  • Quality manuals
  • ISO 9001 standards
  • Project quality plans
  • Manufacturing process selection
43 Questions11 MinutesCreated by AnalyzingEagle42
Name:
Phone:
Who is Chief Financial Officer(CFR) of Our Company
A M Naik
T Mahadevdas
R Shanker Raman
S N Subramaniam
PDCA in Stands for in our Quality System
Which Rating of MCB used for our Job
9 amp ,single pole
16 amp ,single pole
6 amp,single pole
16 amp ,double pole
Who is our Lucknow Cluster Quality Head
Ravi Shanker
A K Srivastava
K K Chubey
Susil Bhatt
Which of the following is not an attitude to become a good Team member
Learn to give and receive useful feedback
Be a leader
Be a contributor
Take responsibility
Manufacturing Process Selection depends on
Material
Quality
Cost
All of the above
Value Engineering Provides
Minimum Functions at necessary cost
Minimum Function at Minimum Cost
Necessary Functions at Minimum Cost
All of above
Below is Not the Parts of the DTR
Conservativer tank
Limb of the core
Commutator
Breather
1 -phase ,16 KVA DTR LV Rating is
16 amp
32 amp
48 amp
64 amp
DTR is
Static device
Dynamic Device
Reliable Device
None of these
Product quality rating is?
Rating the performance of QC engineer
Rating the activity or product
Rating done based on the cube strength results
All of the above
Quality is _________ responsibility
Project Manager's
Quality Engineer's
Site Engineer's
All of the above
Before engaging the subcontractors into the job
Screening & registration is must
Screening is not mandatory if there is an urgent requirement
Screening is not required
None of the above
ISO 9001 does not applicable to
Construction industry
Hotel Industry
Medicine Industry
None of the above
Drawings issued to sites shall be marked as?
Master copy
Controlled copy
Uncontrolled copy
Only with issuing persons signature
CAPA report stands for
Check-Act-Plan-Audit report
Corrective Action-Preventive Action report
Corrective Action Plan Audit report
Correct As Per Audit report
PQP Stands for
Product Quality Plan
Project Quality Plan
Product Qualified Procedure
Project Qualified Procedure
PDCA Stands for
Plan-Do-Check-Act
Plan-Do-Change-Act
Plan-Don't-Check-Act
Plan-Do-Change-Accountability
Internal defects of product can be detected by
Visual Testing
Dye Penetrant Testing
Magnetic Particle Testing
Radiographic Testing
QMS Stands for
Quality Maintained Standards
Quality Management System
Quality Measurable Standards
All of above
Record retention time must be specified
True
False
Training records are required only for personnel performing special processes
True
False
Safe Stacking height of Materials
9 Feet
12feet
7 Feet
15 feet
How Many Division Coming Under Raebarelli DISCOM 9
9
5
6
7
Full form of "SAUBHAGYA" Job
Implementing and Maintaining QMS is the responsibility of
Project Manager
Planning Engineer
Management Representative
All involved in the project
Quality Manual is mandatory document for any ISO certified company
True
False
Management Representative can be out sider to the organisation
True
False
Audits can be done only by
QMS In-charge
CH/RPM/PM
Qualified Auditor
BU Head
The Quality Policy must be understood by all Employees
True
False
Calibration is required for
Only for Survey Instruments
Only for QC instruments
Calibration is not required
For all the instruments in use
Quality Policy Statement is signed by
The Cluster Head
The BU Head
QMS Head
Management of the Company
Procurement of Materials should be from :
Any Vendor who is cheaper
Approved vendors only
Any vendor who provides in short time
Any of above
What is meant by Corrective Action ?
Action taken against a possible occurrence of non-conformity
Action taken, intention of which is to return the non-conformity to a stage of conformity
Action taken to eliminate the cause of non-conformity
All of above
A Non-Conformity can be attendee by
Repair
Rework
Rejection
Any of the above
Quality Objectives shall be set in such a way that it :
Shall be Measurable
Meets the product Requirements
Is in line with Quality Policy
All of above
Our Company Registered Office located at
CHENNAI
LUCKNOW
DELHI
MUMBAI
Our organisation is certified for
ISO 9000
ISO 9001-2015
ISO 9004
All of above
Who is the one of Our Company Founder
Beninng Larsen
Henning Holck-Larsen
Mickel Toubro
Hendri Toubro
ISO stands for :
International Standardised Organisation
International Organisation for Standardisation
Indian Standardised Organisation
All of above
Which Accreditation Body has issued ISO certificate to L&T-ECC ?
BVC
TUV
DNV
LRQA
{"name":"QUIZ COMPETITION", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Test your knowledge on quality management concepts and practices with our comprehensive quiz. Designed for professionals in the field, this quiz will cover essential topics related to ISO standards, quality assurance, and effective teamwork.You'll encounter questions on:Quality manualsISO 9001 standardsProject quality plansManufacturing process selection","img":"https:/images/course2.png"}