What would be the frequency of uninformed Mock Drill (Plant level evacuation)
Twice a year
Once in a year
Once in 2 years
Quarterly
Who will be the fire pump Attendant in case of plant level emergency ( between 5:30pm -9:00 am)
Security
Residency
Electrical officer
Electrician
Who will be the site controller in case of plant level emergency ( between 9:am -5:30 pm)
Section manager
Sr. Officer
Manager Security
Manager Safety
In which condition Long-short-long mode siren is blown?
Incident not in control
When MCP is activated
Incident is in control
Black out drill
How many points plant management shall do as per AP OHS policy to meet objectives
5
11
10
13
Which is the section for Documentation and Information Control as per APSM
1.9
1.8
1.10
1.11
It is a planned, informed and simulated situation created during any working shift within a block (building, floor and the like) by breaking a Manual Call Point to impart training to personnel as per the laid down evacuation procedures of the plant.
Emergency drill
Black out drill
Surprise mock drill
Security Drill
It is a planned, simulated but uninformed emergency created for the entire plant during any shift by breaking a Manual Call Point to assess the effectiveness of evacuation procedures.
Emergency drill
Surprise mock drill
Black out drill
Security drill
{"name":"Mission BSC : Das ka dum", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Name, Emp Id, Department","img":"https://www.quiz-maker.com/3012/images/ogquiz.png"}