Controller Quiz 1

a cartoon-style illustration of a train control center featuring controllers managing trains with screens and communication devices, vibrant colors, and a focus on teamwork

Controller Operations Quiz

Welcome to the Controller Operations Quiz! Test your knowledge and skills on various controller scenarios, safety protocols, and line operations. This quiz is designed for individuals looking to enhance their understanding of the rail system operations.

  • Assess your operational knowledge.
  • Learn about safety practices.
  • Understand line speeds and regulations.
11 Questions3 MinutesCreated by NavigatingTrack42
As at 12/08/2022 can I swing PM03TOW into reverse for a turn back?
Yes
No
What is the maximum LRV line speed currently on the IWLR?
40km/h
50km/h
60km/h
90km/h
574.8km/h
What is the maximum LRV line speed currently on the CSELR?
40km/h
50km/h
60km/h
70km/h
How should I treat a power trip on the L2/L3?
Ignore
Pray they self close and I don't have to do anything
Observe on AVLS that vehicles have come to a stop, open SCADA POW and the relevant substations. Close the breakers as quickly as you can
Observe on AVLS that vehicles have come to a stop, open SCADA POW and the relevant substations. Allow the substation to attempt to self close the breakers. Attempt to close breakers manually after at least 20 seconds
Can a driver who is rostered to drive an Urbos, also drive the X05 in the same day?
Yes
No
They should
62-1 brake failure notification. This refers to which type of brakes at fault:
Electrical
Mechanical
Friction/electro-magnetic
Wind powered
Driver reports oil can symbol on the DDU with a diagonal red strike-through. What happens next
Stop vehicle where it is and contact Rolling Stock for advice
Vehicle continues as normal EOD
What is the TSR speed on the CSELR at George and Hay streets?
5km/h
10km/h
15km/h
20km/h
574.8km/h
What steps should OCC make if a TSR is implemented (before sign posting)
Create an update page for the LRSN and distribute
Make hourly reminders on the open radio and/or AVLS text
Make a request to TDMS that the TSR be sign posted if the TSR should last more than 1 day
Driver performs a LRTAE on the network, proceeded against your authority, what must you do:
Don't report it to anyone, the driver is your mate
Don't report it to anyone, it's easier to pretend you didn't notice
Report it to the duty manager / IMT (in absence of duty manager) including safety
Report it to the police
If the phone lines stop working in the OCC, what should I do?
Contact Transdev IT on 1800 790 831
Go into the technical room and start unplugging things until it works
{"name":"Controller Quiz 1", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Welcome to the Controller Operations Quiz! Test your knowledge and skills on various controller scenarios, safety protocols, and line operations. This quiz is designed for individuals looking to enhance their understanding of the rail system operations.Assess your operational knowledge.Learn about safety practices.Understand line speeds and regulations.","img":"https:/images/course5.png"}
Powered by: Quiz Maker