2

The initial part of a Ragone plot is defined by self-discharge.
True
False
6 The initial part of a Ragone plot is never defined by self-discharge.
True
False
7 For a SMES the initial energy is available when approaching the minimum power.
True
False
8 For a SMES the initial energy is available when approaching the maximum power.
True
False
9 When discharging a battery at maximum power the available energy is very close to the initial one.
True
False
10 When discharging a battery at maximum power the available energy is half the initial one.
True
False
1 There are at least four (4) main classifications of microgrids, based on the applications.
True
False
2 Peer-to-peer control architecture for microgrids is particularly apt for a plug-and-play approach.
True
False
True
False
True
False
True
False
0
{"name":"2", "url":"https://www.quiz-maker.com/QWNVH28DD","txt":"The initial part of a Ragone plot is defined by self-discharge., 6 The initial part of a Ragone plot is never defined by self-discharge., 7 For a SMES the initial energy is available when approaching the minimum power.","img":"https://www.quiz-maker.com/3012/images/ogquiz.png"}