Test Activities

Determining the scope, objectives, and risks of testing
Defining the overall approach of testing
Integrating and coordinating the test activities into the software lifecycle activities
Making decisions about what to test, the people and other resources required to perform the various test activities, and how test activities will be carried out
Scheduling of test analysis, design, implementation, execution, and evaluation activities, either on particular dates (e.g., in sequential development) or in the context of each iteration (e.g., in iterative development)
Selecting metrics for test monitoring and control
Budgeting for the test activities
Determining the level of detail and structure for test documentation (e.g., by providing templates or example documents)
Checking test results and logs against specified coverage criteria
Assessing the level of component or system quality based on test results and logs
Determining if more tests are needed (e.g., if tests originally intended to achieve a certain level of product risk coverage failed to do so, requiring additional tests to be written and executed)
Analyzing the test basis appropriate to the test level being considered
Requirement specifications, such as business requirements, functional requirements, system requirements, user stories, epics, use cases, or similar work products that specify desired functional and non-functional component or system behavior
Design and implementation information, such as system or software architecture diagrams or documents, design specifications, call flow graphs, modelling diagrams (e.g., UML or entity-relationship diagrams), interface specifications, or similar work products that specify component or system structure
The implementation of the component or system itself, including code, database metadata and queries, and interfaces
Risk analysis reports, which may consider functional, non-functional, and structural aspects of the component or system
Evaluating the test basis and test items to identify defects of various types
Identifying features and sets of features to be tested
Defining and prioritizing test conditions for each feature based on analysis of the test basis, and considering functional, non-functional, and structural characteristics, other business and technical factors, and levels of risks
Capturing bi-directional traceability between each element of the test basis and the associated test conditions
Designing and prioritizing test cases and sets of test cases
Identifying necessary test data to support test conditions and test cases
Designing the test environment and identifying any required infrastructure and tools
Capturing bi-directional traceability between the test basis, test conditions, and test cases
Developing and prioritizing test procedures, and, potentially, creating automated test scripts
Creating test suites from the test procedures and (if any) automated test scripts
Arranging the test suites within a test execution schedule in a way that results in efficient test execution
Building the test environment (including, potentially, test harnesses, service virtualization, simulators, and other infrastructure items) and verifying that everything needed has been set up correctly
Preparing test data and ensuring it is properly loaded in the test environment
Verifying and updating bi-directional traceability between the test basis, test conditions, test cases, test procedures, and test suites
Recording the IDs and versions of the test item(s) or test object, test tool(s), and testware
Executing tests either manually or by using test execution tools
Comparing actual results with expected results
Analyzing anomalies to establish their likely causes (e.g., failures may occur due to defects in the code, but false positives also may occur
Reporting defects based on the failures observed
Logging the outcome of test execution
Repeating test activities either as a result of action taken for an anomaly, or as part of the planned testing (e.g., execution of a corrected test, confirmation testing, and/or regression testing
Verifying and updating bi-directional traceability between the test basis, test conditions, test cases, test procedures, and test results.
Checking whether all defect reports are closed, entering change requests or product backlog items for any defects that remain unresolved at the end of test execution
Creating a test summary report to be communicated to stakeholders
Finalizing and archiving the test environment, the test data, the test infrastructure, and other testware for later reuse
Handing over the testware to the maintenance teams, other project teams, and/or other stakeholders who could benefit from its use
Analyzing lessons learned from the completed test activities to determine changes needed for future iterations, releases, and projects
Using the information gathered to improve test process maturity
{"name":"Test Activities", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Determining the scope, objectives, and risks of testing, Defining the overall approach of testing, integrating and coordinating the test activities into the software lifecycle activities","img":"https://www.quiz-maker.com/3012/images/ogquiz.png"}