LQOS Training

An engaging visual representation of quality management and issue resolution in manufacturing, with elements like a team meeting, checklists, and a digital dashboard.

LQOS Training Quiz

Welcome to the LQOS Training Quiz! This quiz is designed to test your knowledge on various aspects of the LQOS process, including issue resolution, responsibilities, and documentation procedures.

Prepare to engage with questions that will challenge your understanding of:

  • Issue detection and entry timelines
  • Roles and responsibilities
  • Methods for verifying solutions
13 Questions3 MinutesCreated by AnalyzingData42
Enter the area you work in
The following are examples of different types of issues:
Design and Manufacturing
Design Attribute
Supplier Quality and Manufacturing Quality
All of the above
Name 3 characteristics that all issues raised must contain:
During MP2 an issue is detected, what’s the time limit for entering it into the AIM system?
24 hours
48 hours
72 hours
None of the above
Who’s responsible for ensuring that root causes of issues are properly determined?
NMP Launch Manager
Purchasing Program Control
PMT Champions
Integration Manager
Design issues where no CR is required can be set to pending with an agreement between ___ and ____ launch managers
Any issue pended without corrective actions requires ______ approval prior to pending.
Purchasing Program Control
Incoming Quality
New Models Launch Manager, the PD Launch Manager, and any other affected Manager
PMT Champions
Name 2 of the 3 methods used to verify the fix of an issue.
The Campaign Prevention Specialist is in charge of closing Class 1 Fresh Eyes issues.
True
False
AIM issue resolution depends only on Purchasing Program Control’s cooperation.
True
False
This person is accountable for the plan and closure of each issue:
PD Launch Manager
Manufacturing Engineer
PMT Leader
Champion
Launch Event Meetings (2) where the Launch Team is responsible to convey the overall program status to upper management
AIM Meetings
New Model Launch Meeting
Launch Management Review Meeting
PD Launch meeting
The following are leads during the quality plan approval, except:
PVT Manager
Manufacturing Quality Coach
Integration Manager
PD Quality Supervisor
{"name":"LQOS Training", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Welcome to the LQOS Training Quiz! This quiz is designed to test your knowledge on various aspects of the LQOS process, including issue resolution, responsibilities, and documentation procedures.Prepare to engage with questions that will challenge your understanding of:Issue detection and entry timelinesRoles and responsibilitiesMethods for verifying solutions","img":"https:/images/course4.png"}
Powered by: Quiz Maker