Module 2

What is the purpose of a pre-construction conference/meeting?
To discuss the project timeline and budget
To review the safety protocols for the construction site.
To resolve issues, problems, and concerns before construction starts.
To assign tasks and responsibilities to the contractor
What is the maximum allowed percentage for mobilization and demobilization costs?
5% of the Estimated Direct Cost (EDC).
2% of the Estimated Direct Cost (EDC).
1% of the Estimated Direct Cost (EDC)
10% of the estimated Direct Cost (EDC)
For Road Projects with a project cost above 200M, what is the maximum prescribed time for the preparation of As-Staked Plan?
90 days
75 days
60 days
45 days
What is the first priority for the location of temporary structures?
DPWH property lots
School lots.
Public health lots.
LGU lots
Who is responsible for preparing the Construction Safety and Health Program (CSHP)?
Project Manager.
Project Engineer.
Safety Personnel of the contractor.
DPWH Field Engineers.
What is the purpose of an as-staked survey in a construction project?
To determine the project's estimated cost.
To assess the quality of construction materials.
To verify the actual field conditions and identify modifications.
To inspect the completed project for compliance.
Department Order governing Test on Bored Piles
DO no. 37, s. 2016
DO no. 44, s. 2020
DO no. 15, s. 2016
Not in the choices
A type of tool primarily utilized to tighten bolts in Steel Construction
Total Station
Torque Wrench
Tower Crane
Boom Truck
What is the term coined for the general component of the bridge that comprises piers, bored piles, columns and abutments?
Superstructure
Substructure
Approach
Slope Protection
What is the document being accomplished during the bored piling activities for records and documentation purposes of the details pouring activity?
Bored Pile Log
Delivery Receipt
Sample Card
Photo Logs
A type of drilling tool attached to a drilling equipment with a hollow, cylindrical section fitted with a hatch on the bottom with a slit that is attached by a hinge to one end of the cylinder
Cleaning Bucket
Rock Auger
Core Barrel
Drilling Bucket
A type of test conducted on a newly completed bored pile in order to determine its bearing capacity?
Pile Integrity Test
Cross Sonic hole Log Test
High Dynamic Strain Test Pile Driving (PDA) Test
Compression Test
According to the Department Order on Test on Bored Piles, the Pile Integrity test should be conducted at least 7 days after the concrete pouring of bored pile.
False
True
Partly true
Depending on compression test result
What is the term coined for the general component of the bridge that comprises girders, approach slab and deck slab?
Superstructure
Substructure
Approach
Slope Protection
A bridge construction methodology that utilizes diesel hammers for the construction of pile foundations?
Bored Piling
Incremental Launching
Pile Driving
Precast Construction
When can a PDA test be conducted on a bored pile?
At 28 days
When 14 day strength is attained
When 28 day, strength is attained
At 7 days
What do you call the upper portion of the tunnel in excavation?
A. Invert
B. Top Head
C. Bench
D. Shield
It acts as an immediate sealing layer after tunnel excavation
Steel Ribs
Second Shotcrete
Portal Wall
Initial Shotcrete
__________ is utilized for the controlled excavation of the tunnel face.
Drill Jumbo
Erecter
Mechanical Excavator
Shotcrete Machine
________ consists of grid beam system to protect slope surfaces from erosion, or used as a supporting structure, combined with ground anchors or soil nails to stabilize the slope against failures.
Shotcrete
Gabions
Coconet
Wall Cribbing
What is the Item No. of Tunnel Excavation?
450
451
452
453
What is the interior finish of Davao City Bypass Tunnel?
Paint
Concrete
Porcelain tiles
Coconet
What is the minimum dimension/area for compaction trial for item 104?
A. 5m x 20m
B. 8m x 30m
C. 10m × 40m
D. 10m x 50m
Roadway embankment of earth material shall be placed in horizontal layers not exceeding loose measurement, and shall be compacted as specified before the next layer is placed.
A) 150mm
b) 180mm
C) 200mm
D) 250mm
What is Item 100 of the DPWH Specification (Blue Book)?
A) Excavation
B) Structure Excavation
c) Removal of Structures and Obstruction
D) Clearing and Grubbing
For item 104, Rolling/ compaction operation shall progress gradually from the sides to the center, parallel to the center of the road and shall continue until the whole surface has been rolled up to the number of passes required where a minimum density of
A) 94% of MDD is attained
B) 95% of MDD is attained
C) 96% of MDD is attained
D) 97% of MDD is attained
In placing concrete, to avoid the segregation of materials, what is the maximum height that the concrete be unloaded into an approved spreading device?
A. 1.0m
B. 1.2m
C. 1.5m
D. 1.8m
During concrete pouring (PCP), vibrators shall not be permitted to come in contact with a joint assembly and the vibrator shall not be operated longer than seconds in any one location
A. 10
B. 15
C. 20
D. 25
It is a form of road that diverts traffic from any existing roadway whenever the construction operations block the flow of traffic.
A) Access Road
B) Detour Road
C) Construction Road
D) Barangay Road
It is the uppermost structural component of the roadway which provides resistance to wear and shearing stress due to traffic load.
Subbase coarse
Base coarse
Surface coarse
Subgrade
One of the main road components that usually located beneath or alongside the roadway used in collecting, transporting and disposing of surface water originating in or near the road right-of-way.
Slope protection structures
Drainage Structures
Retaining walls
Riprap and Grouted Riprap
These are individual stabilizing layers of selected material and designed thickness placed on top of the subgrade to distribute the load transmitted from the surface course.
Subbase and Base Course
Embankment
Surface Course
Subgrade
For the removal of existing structures and obstructions, pavement, Sidewalks, Curbs, etc. Shall be broken into pieces, the size of which shall not exceed ____mm in any dimension.
200
250
300
350
How far from the toe of the fill and slope or beyond rounding of cut slopes should Clearing and Grubbing be extended?
A. 0.5 meter
B. 1.0 meter
C. 1.5 meters
D. 2.0 meters
It is the deterioration of the upper concrete slab surface of more than 10mm affecting the whole slab.
A. Major Scaling
B. Shoving
C. Pothole
D. Raveling
What is the application rate of Tack Coat (Bitumol)?
A. 0.2 - 0.7 liter per sq.m.
B. 0.1 - 0.5 liter per sq.m.
C. 0.2 - 0.9 liter per sq.m.
D. 0.1 - 0.8 liter per sq.m.
Type of Roadway Maintenance in which the activities are regularly performed throughout the year and includes carriageway maintenance and roadside maintenance.
A. Preventive Maintenance
B. Periodic Maintenance
C. Routine Maintenance
D. Emergency Maintenance
The first advance warning sign that must be seen by drivers in order to inform them about the ongoing roadway maintenance activity.
A. End Roadwork
B. Lane Status Sign
C. Hazard Marker
D. Roadwork Ahead
What is the response time for the repair of Code 01 (Pothole)?
3 days
7 days
10 days
30 days
What type of paint defects is the result of inadequate sealing of surface at the first application?
A) Bleeding
B) Blistering
C) Chalking
D) Cracking and Alligatoring
What is the best remedy of paint defects for Flaking?
Scrape off the surface then repaint.
Remove the paint on affected area by wire brush. Seal all cracks against moisture, then apply final coat of paint.
Wash the surface with mildew wash solution diluted with water. Scrub the surface. Rinse with clean water and dry for 48 hours then, apply final coat.
Locate and eliminate the sources of moisture. Scrap off old paint around the area. Then, Let dry and apply good primer then final paint of good quality paint.
It is a synthetic flooring material that is durable, affordable and easy to install.
Carpet tile
Laminated flooring
Linoleum
Vinyl tile
What is the type of Aluminum Curtain System that is composed of large units that are assembled and glazed in the factory, shipped to the site and erected on the building?
Metal Panel Glazing System
Opaque Glazing System
Stick Glazing System
Unitized Glazing System
What type of window is easy to clean and maintain?
Cottage Window
Double Hung Window
Hopper Window
Oriel Window
What type of window is very effective in encouraging cross- ventilation?
Awning Window
Double Hung Window
Louver Window
Sliding Window
What is the BEST ceiling material to be used in the Veranda?
Ficem board
Regular type gypsum board
Water resistant gypsum board
Type x gypsum board
The following are the types of Architectural Works, EXCEPT:
Ceiling works
Form works
Painting works
Water proofing works
What is called a structure includes anything built by fusing together materials with help from mortar?
Ceiling
Concrete
Drywall
Masonry
What type of waterproofing creates a continuous, elastic membrane with excellent mechanical strength, without joints or seams, and is used for both total sealing of flat roof surfaces and for local waterproofing of cracks?
A) Bituminous Coating Waterproofing
B) Cement Based Waterproofing
C) Liquid Waterproofing Membrane
D) Polyurethane Liquid Membrane Waterproofing
Bluebook Item 104
Subgrade preparation
Embankment
Structural excavation
Excavation
{"name":"Module 2", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"What is the purpose of a pre-construction conference\/meeting?, What is the maximum allowed percentage for mobilization and demobilization costs?, For Road Projects with a project cost above 200M, what is the maximum prescribed time for the preparation of As-Staked Plan?","img":"https://www.quiz-maker.com/3012/images/ogquiz.png"}
Powered by: Quiz Maker