Unlock hundreds more features
Save your Quiz to the Dashboard
View and Export Results
Use AI to Create Quizzes and Analyse Results

Sign inSign in with Facebook
Sign inSign in with Google

BIM Test: Check Your Knowledge of Modeling, Data, and Collaboration

Practice BIM test questions with instant scoring and clear explanations.

Editorial: Review CompletedCreated By: D Jay VillaUpdated Aug 26, 2025
Difficulty: Moderate
2-5mins
Learning OutcomesCheat Sheet
Paper art illustration promoting a free online BIM knowledge quiz on a dark blue background.

This BIM quiz helps you check core terms, workflows, coordination, and data basics for the exam. Get instant scoring and brief explanations to see strengths and gaps, then retake to improve. For extra practice, try our multiple choice practice test or the basic orientation plus practice test.

Which standard defines the information management principles for BIM using a Common Data Environment across the project lifecycle?
ISO 19650 (Explanation: ISO 19650 sets out principles for information management using BIM and a CDE across the asset lifecycle.)
BS 8536 (Explanation: BS 8536 focuses on briefing and operational performance, not the full information management framework.)
ISO 9001 (Explanation: ISO 9001 is a quality management system standard, not BIM-specific.)
EN 17412 (Explanation: EN 17412 defines Level of Information Need, not the overarching information management framework.)
undefined
In BIM collaboration, what is the primary function of a Common Data Environment (CDE)?
Hardware virtualization (Explanation: A CDE is an information management environment, not a hardware solution.)
Rendering animations (Explanation: Rendering is not the core function of a CDE.)
3D geometry authoring (Explanation: Authoring is done in modeling tools; the CDE manages information and workflow.)
A single source of truth for storing, managing, and sharing project information (Explanation: The CDE centralizes controlled information, workflows, and approvals.)
undefined
What does EIR stand for in the context of BIM procurement?
External Information Rules (Explanation: Not a standard BIM acronym.)
Exchange Information Requirements (Explanation: EIR specifies what information the appointing party needs and when.)
Enterprise Information Registry (Explanation: Not a BIM procurement term.)
Engineering Information Repository (Explanation: Not the recognized BIM term.)
undefined
Which open standard is used to exchange building model geometry and data across different BIM authoring tools?
PNG (Explanation: PNG is an image format, not for BIM data.)
DWG (Explanation: DWG is a proprietary CAD format and not the primary open BIM model exchange standard.)
IFC (Industry Foundation Classes) (Explanation: IFC is the ISO standard for open, vendor-neutral model exchange.)
PDF (Explanation: PDF is for documents, not model data exchange.)
undefined
COBie primarily captures which type of information?
Asset and equipment data needed for operations and maintenance (Explanation: COBie structures non-graphical asset information for handover.)
Rendering materials and textures (Explanation: COBie does not focus on visualization data.)
Structural finite element meshes (Explanation: COBie excludes analysis meshes.)
Point cloud measurements (Explanation: COBie is not for raw survey data.)
undefined
Which BIM dimension is most closely associated with time-related scheduling information?
4D BIM (Explanation: 4D links model elements with time to simulate construction sequencing.)
5D BIM (Explanation: 5D relates to cost estimation.)
6D BIM (Explanation: Often linked to sustainability or asset management, not time.)
2D BIM (Explanation: 2D refers to plan-based information, not time.)
undefined
What is the primary purpose of a BIM Execution Plan (BEP)?
To approve final asset handover (Explanation: Handover approval is not the BEP's main purpose.)
To define methods, procedures, responsibilities, and standards for delivering information (Explanation: The BEP operationalizes how information will be produced and exchanged.)
To certify design calculations (Explanation: Calculations may be referenced, but certification is not the BEP's purpose.)
To specify contractor payment terms (Explanation: Payment terms are a commercial matter, not the BEP's focus.)
undefined
Which document consolidates task-level information delivery plans into a master schedule in ISO 19650?
MIDP (Master Information Delivery Plan) (Explanation: The MIDP aggregates TIDPs and defines who delivers what, when, and how.)
BEP (Explanation: The BEP describes methods and procedures but is not the consolidated delivery schedule.)
TIDP (Explanation: TIDP is task-team specific, not the consolidated master.)
AIM (Explanation: AIM is the Asset Information Model, not a plan.)
undefined
In ISO 19650 roles, who is responsible for defining the project information requirements and appointing delivery teams?
Lead appointed party (Explanation: They coordinate delivery teams but do not set the appointing party's requirements.)
Information author (Explanation: Information authors produce content; they do not appoint teams.)
Task team leader (Explanation: Task teams deliver specific outputs; they are not the appointing authority.)
Appointing party (Explanation: The appointing party sets EIRs and engages lead appointed parties.)
undefined
Which ISO 19650 information container status indicates content is suitable for coordination but not for construction?
Work in Progress (Explanation: WIP is not yet approved for wider use.)
Published/Documentation (Explanation: Published for construction indicates authorized use in delivery.)
Archive (Explanation: Archive is for historical record, not active coordination.)
Shared (Explanation: Shared indicates information is approved for coordination and review, not for construction.)
undefined
Which schema is designed to communicate issue tracking and coordination comments between BIM tools?
IFC (Explanation: IFC exchanges model geometry and data, not issue threads.)
LandXML (Explanation: LandXML addresses civil data exchange, not BIM issue threads.)
COBie (Explanation: COBie is for asset data handover, not issue tracking.)
BCF (BIM Collaboration Format) (Explanation: BCF exchanges issues, viewpoints, and comments without geometry.)
undefined
Level of Information Need, as defined in EN 17412, replaces which previously ambiguous terms?
GIS and CAD (Explanation: These are domains, not information requirement terms.)
BEP and EIR (Explanation: These are planning documents, not levels of detail definitions.)
LOD and LOI (Explanation: EN 17412 formalizes information requirements, moving beyond varied LOD/LOI interpretations.)
PAS and BS (Explanation: These denote standards types, not information levels.)
undefined
What does model federation mean in BIM workflows?
Replacing discipline models with a master model (Explanation: Federation retains discipline ownership.)
Converting all models into a single native file (Explanation: Federation avoids destructive merging of native files.)
Exporting models only to 2D drawings (Explanation: Federation is about coordinated 3D datasets.)
Combining discipline models into a coordinated aggregate without merging native files (Explanation: A federated model references distinct source models for coordination.)
undefined
Which classification system is widely used in the UK for organizing project information by tables such as elements and systems?
Uniclass 2015 (Explanation: Uniclass provides structured tables for consistent classification.)
OmniClass (Explanation: OmniClass is common in North America, not the primary UK system.)
IFC (Explanation: IFC is a data schema, not a classification system.)
MasterFormat (Explanation: MasterFormat is a North American specification classification.)
undefined
In a security-minded BIM approach per ISO 19650-5, what is a key control?
Banning cloud CDEs (Explanation: Security is about risk management, not blanket bans.)
Removing all metadata from models (Explanation: Not universally required and may harm utility.)
Publishing all data publicly for transparency (Explanation: This contradicts security-minded principles.)
Applying need-to-know access to sensitive information (Explanation: Limiting access mitigates security risks for critical assets.)
undefined
Which of the following best describes Level of Information Need granularity?
Let each author decide ad hoc (Explanation: Requirements should be purpose-driven and explicit.)
Specify purpose, information content, and form, just enough to meet requirements (Explanation: EN 17412 emphasizes sufficiency over arbitrary detail levels.)
Always use the highest level of detail available (Explanation: Over-specification wastes effort.)
Define only geometric detail (Explanation: It includes alphanumeric and documentation too.)
undefined
In clash management, which metric reflects how quickly identified issues are being resolved over time?
Sheet count (Explanation: Number of sheets does not measure clash resolution.)
Issue burn-down rate (Explanation: Tracks the reduction of open issues per period.)
Polygon per second (Explanation: Not a coordination metric.)
File transfer speed (Explanation: Network speed is unrelated to issue resolution.)
undefined
Which export setting best preserves property sets and classifications during IFC exchange?
Export geometry only (Explanation: Drops important data.)
Map native attributes to IFC property sets and maintain classification references (Explanation: Proper mapping preserves non-graphical data.)
Explode all objects to faces (Explanation: Destroys semantics.)
Purge all properties to reduce size (Explanation: Loses critical information.)
undefined
In the context of GIS and BIM integration, which data alignment is most critical?
Matching texture resolutions (Explanation: Visual textures are secondary to spatial alignment.)
Using only 2D shapefiles (Explanation: Integration often requires 3D and attributes, not only 2D.)
Identical software brand versions (Explanation: Interoperability matters more than matching brands.)
Coherent coordinate reference systems and georeferencing (Explanation: Correct CRS ensures models align with site context.)
undefined
What is a typical acceptance criterion for model element authorization at a specific stage?
Authored by the most senior person (Explanation: Seniority is not the criterion.)
Has smallest file size (Explanation: Size is not a validity criterion.)
Contains maximum possible detail (Explanation: Over-detail is not a criterion.)
Meets defined Level of Information Need for purpose, reviewed, and approved (Explanation: Authorization is purpose-led and validated.)
undefined
0

Study Outcomes

  1. Understand Core BIM Concepts -

    Identify and define essential Building Information Modeling principles to strengthen your foundation before taking the bim test online.

  2. Analyze Practical Scenarios -

    Evaluate real-world BIM workflows and case studies to sharpen your problem-solving skills for the bim exam.

  3. Apply Key Terminology -

    Use industry-standard language accurately when discussing BIM processes, ensuring clarity during the online bim quiz and professional practice.

  4. Interpret Quiz Feedback -

    Review and understand detailed score reports to pinpoint knowledge gaps and improve performance on future bim tests.

  5. Track Skill Progression -

    Monitor your results across multiple attempts to measure growth and readiness for certification or advanced BIM tasks.

Cheat Sheet

  1. BIM Dimensions (3D - 7D) -

    The 3D model provides the geometric basis, 4D incorporates scheduling data, 5D adds cost estimation, 6D integrates sustainability metrics, and 7D focuses on facility management. Use the mnemonic "3 shapes, 4 time, 5 price, 6 planet, 7 maintain" to lock each dimension's purpose. Understanding these layers ensures you can articulate how bim test questions may probe data integration across project lifecycles.

  2. BIM Maturity Levels (0 - 3) -

    Per ISO 19650, BIM maturity spans Level 0 (paper/CAD) through Level 3 (fully integrated), with Level 1 offering managed 3D and Level 2 enabling collaboration via a Common Data Environment. Paper, Private, Shared, Single is a handy mnemonic to recall L0 - L3 progression. Level 3, often referenced in a bim exam, represents true multi-stakeholder integration and data interoperability.

  3. Level of Development (LOD 100 - 500) -

    The AIA's LOD spec ranges from LOD 100 (conceptual massing) to LOD 500 (field-verified as-built conditions). LOD 300 delivers precise dimensions for design-authoring, while LOD 500 confirms what's actually built. A simple "1-3-5" trick ties concept, design development, and construction completion to each stage.

  4. Key BIM Uses: Clash Detection & Scheduling -

    BIM authoring, clash detection, 4D scheduling, and 5D cost estimation are top topics in any online bim quiz. For instance, Navisworks or Solibri can automate clash reports, and 4D simulations visually map model elements to construction timelines. Practicing real-world scenarios for each use case solidifies your ability to answer bim test online questions.

  5. Common Standards: ISO 19650 & NBIMS -

    ISO 19650 and the US National BIM Standard (NBIMS) define how information is structured, named, and exchanged in projects. These frameworks are key references in both bim exam questions and professional practice, clarifying data requirements, roles, and delivery stages. Recite "One-Nine-Six-Five-Zero" to anchor ISO 19650 in your memory and associate NBIMS with US best practices.

Powered by: Quiz Maker