EXIT EXAM

Create an image of a civil engineer standing in front of a construction site with blueprints in hand, surrounded by cranes and buildings under construction, with a clear blue sky.

Civil Engineering Exit Exam Quiz

Test your knowledge with our comprehensive Civil Engineering Exit Exam Quiz designed for aspiring professionals in the field. This quiz consists of 30 questions that cover a wide range of topics including structural analysis, materials engineering, traffic management, and project management.

Challenge yourself and measure your understanding of crucial civil engineering concepts. You'll encounter:

  • Multiple-choice questions
  • Calculations and problem-solving scenarios
  • Real-world application of engineering principles
30 Questions8 MinutesCreated by MeasuringMind537
A soil has a specific gravity of 2.68 and a void ratio of 0.73 if the degree of saturation is 92%. Compute the dry density of the soil in g/cc
In order to be recycled concrete cannot contain
Water
Aggregate
Sand
None of the above
A plain round bar made out of steel weight 0.5kg with dimensions of 155 mm in diameter and 1.5m in length calculate for its density in g/cc
What is the effect of staggered holes in steel tension members?
Increases the tensile strength of member
Does not affect the tensile strength of member
Halves the tensile strength of member
Reduces the tensile strength of member
Measure of the size of the particle cement
Soundness
Normal Consistency
Time Setting
Fineness
It is A govenrment policy covering technical requirements in constructing or renovating building and structures in the Philippines to secure the life, health, property and welfare of Filipinos
National Structural Code
Presidential Decree 1096
Architectural and structural plans
Building permit requirement
The branch of engineering that deals with improvement of traffic performance, traffic studies and traffic network is called?
Traffic engineering
Traffic management
Railway engineering
Highway engineering
Concrete compressive strain is expected to be at ______ when the concrete is on the verge of crushing as per NSCP
0.003
0.006
0.008
0.009
Civil engineers can act independently as long as it is written in the contract.
True
Flase
A floor joist 50mm x 200mm has a span of 5m. If it carries a total floor load of 5kPa. Determine the spacing joist in mm to develop a bending stress of 8MPa.
270mm
120mm
170mm
150mm
Which of the following does not belong to the group?
Nuclear Method
Sand-Cone Method
Fall Cone Method
Rubber Balloon Method
An open channel to be made of concrete is to be designed to carry 5m3/s at a slope of 0.000655. Find the most efficient cross section for (a) semicircular section (solve for the diameter in m)
1.847m
1.645m
1.457m
1.954m
Reservoir A has an elevation of 300mm circular pipe is connected to it with diameter of 300 mm and length of 200 m, while reservoir B is at an elevation 200 mm with circular pipe connected to it diameter 250mm and length of 250 m and Reservoir C elevation with a circular pipe attached to it, diameter is 600 mm and length of 450mm. All pipes meet at junstion. Determine the flow rate in Pipe A in m3/s. Use f=0.02
0.745 m3/s
0.992 m3/s
0.224 m3/s
0.994 m3/s
Locational clearance requirements in acquiring building permit are the following except:
Architectural plan
Site development plan
Foundation plan
Lot plan
If super elevation is not provided on a horizontal curve of a highway, then on which portion of the road are pot holes likely to develop?
Center of road
Outer edge of the road
Inner edge of the road
Shoulder of the road
The maximum super elevation to be provided on the road curve is 1 in 15. If the rate of change of super elevation is 1 in 120 and the road width is 10 m, then the minimum length of the transition curve on either end will be:
180m
80m
125m
30m
The resistance factor for tension in structural steel in gross section yielding is
75%
65%
90%
85%
A surveying student walked along a given line that was known to be 200.0 ft long to determine her average unit pace. She paced the line four times, recording 78, 76.5, 77 and 76 paces, respectively, in her field book. If the surveyor then counted on average of 123.5 paces while pacing off a line of unknown distance, what is the distance?
325.70 ft
321.30 ft
320.25 ft
328.30 ft
A curving roadway has a design speed of 80 km/hr. At one horizontal curve, the superelevation has been set at 6% and the angle of side fraction is found to be 6o. Determine the impact factor
0.19
0.17
0.20
0.16
If civil engineers inform the client via document about a certain change involving site implementation then civil engineers can already implement the change with or without the approval of the client.
True
False
A summit curve is formed at the intersection of a 3% up gradient and 5% down gradient. To provide a stopping distance of 128m, the length of summit curve needed will be:
298 m
322 m
271 m
340 m
These members are generally vertical and resist axial compressive loads
Columns
Slabs
Beams
Footing
In general, it is the densification of soil by removal of air, which requires mechanical energy
Compaction
None of the above
Consolidation
Compression
Metropolitan Manila has a road network following which type of road pattern?
Radial or Circular Pattern
Rectangular Pattern
Hexagonal Pattern
Radial or Star Pattern
It is the minimum distance required to stop a vehicle before it reaches a stationary object.
Decision Sight Distance
Stopping Sight Distance
Passing Sight Distance
Intersection Sight Distance
In Project Management, it refers the sequence of the project network activities which add up to the longest overall duration. This determines the shortest time possible to complete the project
Risk
Critical Path
Scheduling
None of the above
Calculate the steel ratio that will produce a tension-controlled failure if compressive strength f'c = 28 MPa and steel yield strength fy
0.02167
0.03258
0.04567
0.02617
They are flat horizontal panels that support the floor
Beams
Columns
Footings
Slabs
It is an uncertain event or condition that, if it occurs, has a positive or negative effect on one or more project objectives such as scope, schedule, cost, and quality.
Critical Path
All of the above
Risk
Scheduling
The steel tensile strain limit for a tension-controlled failure is
0.009
0.007
0.005
0.003
{"name":"EXIT EXAM", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Test your knowledge with our comprehensive Civil Engineering Exit Exam Quiz designed for aspiring professionals in the field. This quiz consists of 30 questions that cover a wide range of topics including structural analysis, materials engineering, traffic management, and project management.Challenge yourself and measure your understanding of crucial civil engineering concepts. You'll encounter:Multiple-choice questionsCalculations and problem-solving scenariosReal-world application of engineering principles","img":"https:/images/course1.png"}
Powered by: Quiz Maker