BUILDING CONSTRUCTION METHODS

A detailed illustration of various building construction methods and tools, showcasing a construction site with workers, architectural plans, and construction materials.

Building Construction Methods Quiz

Test your knowledge on building construction methods with our comprehensive quiz! Designed for students, professionals, and enthusiasts alike, this quiz provides a great way to assess your understanding of key concepts in the field of construction.

  • Multiple choice questions
  • Covers a variety of construction topics
  • Perfect for exam preparation
85 Questions21 MinutesCreated by ConstructingWall157
It is a technical analysis of traffic problems and safety issues relating to specific development.
Environmental Compliance Assessment
Environmental Impact Assessment
Traffic Impact Assessment
None of the above
€�No person, firm or corporation, including any agency or instrumentality of the government shall construct, alter, repair, convert, use or occupy, move, demolish and add any building/ structure or any portion thereof or cause the same to be done without first obtaining a building permit therefor from the Building Official assigned in the place where the subject building/ structure is located or to be done.”
Rule II - Section 301.1 of PD 1096
Rule III - Section 301.1 of PD 1096
Rule III - Section 302.1 of PD 1096
Rule II - Section 302.1 of PD 1096
Part of a Building Permit?
Locational Clearance
Tree-Cutting/Tree-Pruning/Earth-Balling Permit
Permit to Cut Coconut Trees
All of the above
What is mobilization in the context of construction projects?
The deployment of resources to the project site.
The process of dismantling temporary structures.
The hiring of additional contractors.
The final inspection of the completed project.
What is the maximum allowed percentage for mobilization and demobilization costs?
5% of the Estimated Direct Cost (EDC)
2% of the Estimated Direct Cost (EDC)
1% of the Estimated Direct Cost (EDC)
10% of the Estimated Direct Cost (EDC)
Who is responsible for ensuring compliance with the number of manpower and equipment during mobilization?
DPWH Field Engineers
Project Manager
Project Inspector
Safety Personel
For Building Projects with a project cost above 200M, what is the maximum prescribed time for the preparation of As-Staked Plan?
60 days
75 days
90 days
45 days
What is the purpose of an as-staked survey in a construction project?
To determine the project's estimated cost.
To assess the quality of construction materials.
To verify the actual field conditions and identify modifications
To inspect the completed project for compliance
Department Order No. _________, Series of _______: Guidelines on the Processing and Approval of the “As-Staked” Plan
15, 2016
197, 2016
16, 2015
17, 2016
Building Permit shall be considered automatically revoked if project is not commenced within _____ year from date of issuance.
1
3
2
4
To provide, receive and discharge water, liquid and water-carried wastes into the drainage system with which they are connected to.
PLUMBING FIXTURE
SEWAGE SYSTEM
SANITARY SYSTEM
SEPTIC TANK
Designed to separate and store the solids and partially digest the organic matter in the sewage
PLUMBING FIXTURE
SEWAGE SYSTEM
SANITARY SYSTEM
SEPTIC TANK
System that removes effluent discharged from plumbing fixture to an approved point of disposal
PLUMBING FIXTURE
SEWAGE SYSTEM
SANITARY SYSTEM
SEPTIC TANK
Also known as collection line of a plumbing system
SUMP
HOUSE DRAIN
SANITARY DRAIN
SEPTIC TANK
A type of house drain that receives the discharge of sanitary and domestic wastes only. The waste is conveyed to a septic tank or public sewer.
SUMP
HOUSE DRAIN
SANITARY DRAIN
SEPTIC TANK
A part of water supply network with components that carry potable water from a centralized treatment plant or wells to consumers to satisfy residential, commercial, industrial and fire fighting requirements?
PLUMBING FIXTURE
SEWAGE SYSTEM
SANITARY SYSTEM
WATER DISTRIBUTION SYSTEM
A pit or receptacle at a low point to which the liquid are drain
SUMP
HOUSE DRAIN
SANITARY DRAIN
SEPTIC TANK
A watertight, multi-chambered receptacle that receives sewage from houses or other buildings
PLUMBING FIXTURE
SEWAGE SYSTEM
SANITARY SYSTEM
SEPTIC TANK
Manufactured device, or a prefabricated assembly, or an on-the-job assembly of component parts, and which is an adjunct to the basic piping system and plumbing system and plumbing fixtures
SUMP
DRAINS
FIXTURES
PLUMBING APPURTENANCES
System that conveys all storm clear water, or surface water waste except sanitary wastes.
PLUMBING FIXTURE
SEWAGE SYSTEM
SANITARY SYSTEM
STORM DRAIN SYSTEM
Set of instructions or guidelines that are typically found on Architectural and Engineering drawing. Provide information on everything from project scope and site conditions to materials and finishes.
Technical Specifications
General Notes
Miscellaneous Details
Legends
€�maçonerie” is a term came from what language?
French
English
Filipino
Japanese
Glass block is another type of Unit Masonry?
False
True
D ka sure
Idk
What do you call a person who does carpentry?
Carpenter
Dancer
Singer
Mason
Tongue and Groove, Mortise and tenon are all examples of Joinery?
Pwede
False
Idk
True
Refractories or refractory masonry are porcelain materials?
False
True
D ka sure
Idk
Tiles, vinyl on the floor are examples of____?
Wall finishes
Floor finishes
Baka mamali ka pa
Sure one point
It is a type of ceiling which slant in one direction.
TIN Ceiling
Cove Ceiling
Shed Ceiling
Secret
It is an opening in the wall of a building for admission of natural light and ventilation.
Door
Windows
Sky lights
Gets mo na yan
A process of applying paint
Varnishing
Alam mo to
Painting
Boysen
What is the governing law in mechanical installations?
Philippine Mechanical Engineering Code 2010
Philippine Mechanical Engineering Code 2011
Philippine Mechanical Engineering Code 2012
Philippine Mechanical Engineering Code 2013
This is a mechanical system that provides cold air inside room or enclosed space by removing heat and humidity from the indoor air.
Vertical Transportation System
Fire Protection System
Ventilating System
Air Conditioning System
Which is not a characteristic of a refrigerant?
High boiling and freezing point
Chemical stability
Non-flammable
Environment-friendly
When the refrigerant reaches this stage, it is in liquid form. What do call this stage in the refrigeration cycle?
Compression
Expansion
Evaporation
Condensation
 
This is the main engine that drives an air conditioner and is like a human heart.
Accumulator Tank
Printed Circuit Board
Compressor
Condenser and Evaporator Coil
Which ventilating system designed to remove contaminated air from the toilets, kitchens, pantries, storage rooms and other concealed spaces including basement or parking areas?
Fresh Air System
Exhaust Air System
Pressurization System
Air Circulation System
Which ventilating system installed in emergency exit stairways that will prevent fumes from entering into the stairways while providing fresh air during evacuation.
Pressurization System
Emergency Air System
Pressurizing System
Constant Pressure System
What gauge no. Of galvanized metal sheet is required for 775mm to 1500mm wide?
Gauge No. 20
Gauge No. 22
Gauge No. 24
Gauge No. 18
A platform or an enclosure raised and lowered in a vertical shaft to transport people and freight.
Evaporator
Escalator
Excavator
Elevator
A standpipe extends into the building to supply firefighting water to the interior of the structure via hose outlets, often located between each pair of floors in stairwells in high rise buildings. What do you call this fire protection system?
Dry Standpipe System
Automatic Fire Sprinkler System
Gas Suppression System
Wet Standpipe System
Item 800 in the Standard Specification for Public Works Structures Volume III?
Clearing ang Grubbing
Removal of Structure and Obstructions
Excavation
Structural Excavation
Item 801 in the Standard Specification for Public Works Structures Volume III?
Clearing ang Grubbing
Removal of Structure and Obstructions
Excavation
Structural Excavation
Item 803 in the Standard Specification for Public Works Structures Volume III?
Clearing ang Grubbing
Removal of Structure and Obstructions
Excavation
Structural Excavation
All are unsuitable material for embankment EXCEPT
Organic soils such as peat and muck
Soil with plasticity index not more than 6
Soil with liquid limit of 90
Soil with very low natural density
In depositing of concrete, what is the required maximum drop height?
3m
1.5m
1m
0.5m
What type of joint is used to minimize cracking in concrete?
Construction Joint
Expansion Joint
Contractiom Joint
Control Joint
It is a long footing supporting two or more columns in one row.
Combined Footing
Mat Foundation
Cantilever Footing
Strip Footing
In mixing and delivery of concrete, retempering of concrete will be permitted?
Yes
No
Maybe
Neither a or b
Kinds of equipment and apparatus used for post-tensioning, except for?
Grouting pump
Pumpcrete
Hydraulic Pump
Hydraulic Jack
Minimum cover (mm) of Walls, suspended slab and joints.
20mm
60mm
75mm
40mm
Minimum time before the removal of forms used for floor slab.
1 day
7 days
14 days
28 days
Type of shore used for cast in place slab.
Dead Shoring
Rakking Shoring
Horizontal Shoring
Flying Shoring
How many days, prior to fabrication, should the contractor give notice.
3 days
7 days
14 days
15 days
Steel erection procedure where bolted connections will be made but not fully.
Establishing Foundation
Lifting and Placing
Aligning of Structure
Bolting-up
What is the primary connection method for steel structures?
Welded Connection
Bolted Connection
Rivet Connection
Nail Connection
Communication is an important tool in building construction. Without clear and effective communication, the team can remain unaware of an issue until it’s too late for rectification, therefore, Project Engineers ______________________.
Project Engineers need to enact clear guidelines and must build an effective communication among the team that informs the members of any progress or obstacles, solving problems proactively.
Project Engineers will solve the problem by himself/herself with agreements reached without informing the members of the Project Management Team.
Project Engineers will rectify right away the issues.
Project Engineers will blame his/her team for the issues that have been arising.
When there is a skills gap in the team, it could cause some delays and the solution is to ________________________.
Be aware of the said skills gaps before it could impact the project negatively, filling the said gaps quickly and efficiently.
Train the existing employees with existing duties and responsibilities.
Wait for the prospective employees to apply to fill up the skills gap.
Utilize your existing employees to be multi-taskers even though they are already overloaded with work.
A common problem in building construction wherein construction sites are attractive to vandals leave marks. Also, thieves have always seen construction sites as great targets for their materials and expensive tools
Safety Risks
On-site Theft and Vandalism
Scheduling Problems
Unreliable Contractors
A common problem in building construction wherein insurance is a major expense with worker’s compensation insurance, as well as general liability insurance and a variety of other business-related insurance policies.
Safety Risks
On-site Theft and Vandalism
High Cost of Insurance
Unreliable Contractors
A common problem in building construction wherein the laws, regulations, and guidelines related to the construction changes during the project implementation must be complied with, which causes confusion and possible cost implications.
Safety Risks
Regulations Compliance
High Cost of Insurance
Unreliable Contractors
A common problem in building construction wherein various documents relative to the project implementation such as drawings/plans, and contract documents, must be managed and if failed, it can lead to serious construction problems.
Safety Risks
Regulations Compliance
Documentation Management
Unreliable Contractors
A common problem in building construction wherein construction equipment maintenance and replacement cause a large percentage of construction project overrun costs and that all equipment has a life span and eventually the machine and equipment breakdowns will cause delays in the project.
Safety Risks
Regulations Compliance
Documentation Management
Equipment Breakdowns
A common problem in building construction wherein construction sites are one of the industries that have the highest risk of injury and accidents.
Safety Risks
Communication Problems
Documentation Management
Equipment Breakdowns
A common problem in building construction wherein there is poor communication causing confusion and misconceptions.
Safety Risks
Communication Problems
Documentation Management
Equipment Breakdowns
A common problem in building construction wherein there is a lack of experienced and competent workers to fill the growing demand.
Safety Risks
Communication Problems
Skilled Labor Shortage
Equipmemt Breakdowns
In Building Management System (BMS), it is a device which detects or measures a physical, electrical or environment property and converts detected or measured property into signals to be processed by the controller?
Actuators
Direct Digital Controller
Management Layer
Sensors
It is an Intelligent Microprocessor based controller network, installed to monitor and control building's technical systems and services?
BMS (Building Management System)
CATV (Community Antenna Television System)
FDAS (Fire Detection and Alarm System)
PA (Public Address System)
What layer in BMS typically comprise of sensors and actuators?
Automation Layer
Field Layer
Initiating Devices Layer
Management Layer
It is a signal that represents data as a sequence of discrete values and only take one value from a finite set of values like zero and one?
Analog Signal
Digital Signal
Radio Frequency Signal
Wireless Fidelity Signal
An accepted rules and standards that allows communication and data-sharing between building automation equipment, like for example Bacnet, Modbus, Lonworks etc, is known as?
Communications Protocols
Electronics Protocols
Internet Protocols
Web Protocols
In a simple Electronic System, what are the three basic components?
Input, Roughing-ins, Output
Input, Wiring, Output
Input, Processing, Output
Input, Wifi, Output
Electronics works shall be under the supervision of duly licensed ECE, ECE stands for?
Electronics Engineer
Electronics Civil Engineer
Electronics Cute Engineer
Electronics and Communication Engineer
It is the central hub of the fire alarm and detection system (FDAS) and acts as the brain of the system?
Fire Alarm Control Panel
Initiating Devices
Notification Devices
Smoke Detector
What are the two Types of FDAS?
Analog & Addressable
Conventional & Addressable
Conventional & Digital
Internet Protocol (IP) & Conventional
What is Door Access and Card Reader System?
A system consisting of an addressable fire alarm control panel and addressable devices
A system that allows you to keep an eye on what's going on in and around your business
Medium to make public broadcasts of routine, situational, important and emergency announcements
A system to provide quick, convenient access to those persons who are authorized, while at the same time, restricting access to unauthorized people
An act providing for a more responsive and comprehensive regulation for the registration, licensing and practice of Professional Electronics Engineer, Electronics Engineer and Electronics Technicians, repealing Republic Act No. 5734, is known as?
Republic Act 9192 "Electronics Engineering Law of 2004"
Republic Act 9192 "Electronics Engineering Law of 2005"
Republic Act 9292 "Electronics Engineering Law of 2004"
Republic Act 9292 "Electronics and Communication Engineering Law of 2004"
The code that discusses the design and application, invitation, maintenance, testing, and inspection of fire detection and alarm system, is known as?
The Philippine Electronics Code Book I
The Philippine Electronics Code Book II
The Philippine Electronics Code Book III
The Philippine Electronics Code Book IV
The code that covers the specifications for the CATV system, its installation, cabling, operating parameters (analog and digital), cable internet specifications, grounding, cable specifications, and testing procedures, is known as?
The Philippine Electronics Code Book I
The Philippine Electronics Code Book II
The Philippine Electronics Code Book III
The Philippine Electronics Code Book IV
Who has the sole authority to provide consulting services and to sign and seal electronics plans, drawing, permits, applications, specifications and other electronics systems technical documents?
Civil Engineer
Electronics Engineer
Professional Electronics Engineer
Professional Electronics and Communication Engineer
Which of the following minimum information is not included in the electrical permit?
Lot Owner
Building Official
Electrical Engineer who signed and sealed electrical plans and specifications with photocopy of valid Professional Tax Receipt (PTR) and valid Professional Regulation Commission (PRC) License.
Professional Electrical Engineer who signed and sealed electrical plans and spectficacions with phococopy o valid Professional Tax Receipt (PIR) and valid Professional Regulation Commission (PRC) License.
Who is responsible to seal electrical plans. etc.. And to practice electrical engineering in its full scope as defined in the Philippine Electrical Code?
Office of the Building Official
Registered Electrical Engineer
Registered Master Electrician
Registered Professional Engineer
What is the purpose of the Philippine Electrical Code?
Compliance therewith the proper maintenance.
This code is intended as a design specification or an instruction manual to qualified persons
This code contains provisions that are considered minimum requirements necessary for safety.
The purpose of this code is the practical safeguarding of persons and property from hazards arising from the use of electricity
A registered master electricians field ot practice includes the installation, wiring. operation. Maintenance and repair of electrical machinery. Equipment and devices. In residential, commercial and industrial buildings. In power plants. substation. watercrafts. Electric locomotives. And the like: Provided. That if the installation or the machinery is rater in excess of ... Kva). Or in excess of (__... volts) the work shall be under the supervision of the professional electrical engineer or registered electrical engineer.
300Kva & 300Volts
400Kva & 500volts
500Kva & 600Volts
600Kva & 620 Volts
What is R.A. 7920?
Is an act providing for a more reactive and extensive regulation for the practice. Licensing and registration of electrical engineers and electricians.
Is an act providing for a more receptive and complete regulation for the practice. Licensing and registration of electrical engineers and electricians.
Is an act providing for a more reactive and comprehensive regulation for the practice. Licensing and registration of electrical engineers and electricians.
Is an act providing for a more responsive and comprehensive regulation for the practice. Licensing and registration of electrical engineers and electricians.
What is Flexible Metal Conduit (FMC)
 
{"name":"BUILDING CONSTRUCTION METHODS", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Test your knowledge on building construction methods with our comprehensive quiz! Designed for students, professionals, and enthusiasts alike, this quiz provides a great way to assess your understanding of key concepts in the field of construction.Multiple choice questionsCovers a variety of construction topicsPerfect for exam preparation","img":"https:/images/course6.png"}
Powered by: Quiz Maker