CHC Quiz 'Not Quite Right'

What is 'Not Quite Right' about this photo?
A. Exit sign incorrectly located
B. Floor expansion joint incorrectly located
C. Matting incorrectly located
What is 'Not Quite Right' about this photo of a shopping centre?
A. Downpipe extends below footpath slab
B. Metal cladding extends to ground level next to footpath
C. Exposed steel column has holes in them
What is 'Not Quite Right' about this photo?
A. Exposed wires
B. Clock should be digital
C. Clock is not centered between mullions
D. Someone forgot to consider the space required by the clock
Should we dimension to structural face or finished face of a wall?
0%
0
A. Structural Face
0%
0
B. Finished Face
What is this picture above trying to convey?
A. Services easement can be ignored if it is not located directly over the authority sewer pipe.
B. Building footing should not be within angle of repose of authority sewer pipe
C. Grass can be planted over services easement
What is this picture above trying to convey?
A.Flags can catch fire if too close to power lines
B. Internally illuminated signage must not be located where power lines exist
C. There are strict clearances to power lines that buildings and canopies need to abide to.
What is 'Not Quite Right' about this photo?
A. Extinguisher is not locked and can be assessed by anyone
B. Wall not wide enough
C. Too many light switches next to each other
What is 'Not Quite Right' about this photo?
A. Yellow and white don't match
B. Return junctions were not considered
C. Skirting should be yellow
What is 'Not Quite Right' about this photo?
A. Skirting thickness is not appropriate for the timber sprung floor
B. GPOs too close to each other
C. Timber grain should run in the other direction
What is 'Not Quite Right' about this photo?
A. Artificial lights are not required because of the highlight windows
B. Vinyl Graphics should not be directly applied to plasterboard wall
C. Bulkhead not in line with wall due to structural beam flange protuding past the frame thickness
What does the Code PM2-A mean in CHC elevation drawing
A. Profiled Metal Cladding Type A - Colour 2
B. Profiled Metal Cladding Type 2 - Colour A
C. Profiled Metal Cladding Type 2 - Above
D. Profiled Metal Cladding Type 2 - Vertically Laid
Which one is the correct way of numbering Apartments?
A.
B.
What is 'Not Quite Right' between this Marketing drawing and this Construction drawing
A. Wall types not shown on the Marketing drawing
B. Sink is on the other side of the oven
C. Door numbers not shown on the Marketing drawing
What is 'Not Quite Right' about this canopy steel structure?
A. No allowance for gutters and sump
B. Purlins not equally spaced
C. Steel fascia has the toes facing out
What does this drawing of the roof demonstrate?
A. Allowance should be made for roof spacers which can affect parapet heights
B. Metal roof can be directly over purlins
C. Insulation blanket can be squashed to pretty much nothing at certain points
What does this drawing of the roof demonstrate?
A. Safety mesh should always be over purlins
B. Thermal break tape is optional
C. B. Metal roof can be directly fixed over a thermal break tape over purlins if using safebridge system
What does this table demonstrate?
A. Beds can easily fit within any standard lift dimensions
B. Lift car and shaft dimensions should be carefully co-ordinated at the design stages
C. All lifts should be stretcher compliant
What is 'Not Quite Right' about this BIM model?
A. Steel beam is not big enough
B. Services and structure have not been coordinated
C. Services pipes should join in at right angles
What is 'Not Quite Right' about this photo?
A. Flexi ducts are touching water pipes
B. Flexi ducts are squeezed to a minimum
C. Flexi ducts are touching the gang nail plate
What frame can span higher?
0%
0
A. Timber Stud Frame
0%
0
B. Steel Stud Frame
What is 'Not Quite Right'about this drawing?
A. Door Tag is incorrect
B. 100 shs columns within a 90mm wall
C. Corridor width is insufficient
Identify the compliant accessible shower facility
A.
B.
Which one of these is 'Not Quite Right'?
0%
0
A. Services doors open out and encroach no more than 600mm over title boundary
0%
0
B. Services doors open out and are on the title boundary
What is 'Not Quite Right'about this drawing?
A. Builder is unable to ascertain whether the wall cladding is stepping along the facade
B. Metal cladding and CFC cladding should not be next to each other
C. Metal cladding should extend to the ground
What is 'Correct' about this drawing?
A.Well detailed
B.Simple and Easy to understand
C. Secondary steel detailed and coordinated
On a serious note, who will make a better president at this upcoming US presidential election?
A. Donald Trump
B. Hillary Clinton
C. Elmo
{"name":"CHC Quiz 'Not Quite Right'", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"What is 'Not Quite Right' about this photo?, What is 'Not Quite Right' about this photo?","img":"https://cdn.poll-maker.com/10-477386/detail-coordination---floor-joint-location.png?sz=1200-000006100053"}
Powered by: Quiz Maker