Test Your AFI 10-201 Expeditionary Communications & Project Management Skills

Dive into MPTO 00-33A-1001 scenarios and prove your mastery

Difficulty: Moderate
2-5mins
Learning OutcomesCheat Sheet
Paper art illustration depicting quiz theme communications expeditionary plans project management on golden yellow background

This quiz helps you apply AFI 10-201 in expeditionary communications - planning comm nets, allocating assets, and tracking projects under pressure. Work through MPTO 00-33A-1001 tasks and real-world scenarios to spot gaps before exercises or deployments, and compare your approach to AFI 10-201 guidance.

What is the primary purpose of AFI 10-201?
To direct medical readiness programs
To set policy for expeditionary operations
To establish financial management procedures
To outline personnel evaluation criteria
AFI 10-201 provides guidance on expeditionary plans, outlining policies and procedures for communications support during deployed operations. It ensures standardized planning across units. This directive is key to preparing expeditionary architecture and sustainment.
Which section of AFI 10-201 addresses initial deployment planning?
Chapter 5
Chapter 7
Chapter 2
Chapter 9
Chapter 2 of AFI 10-201 covers the initial deployment planning phase, including requirements determination and coordination. It sets the framework for expeditionary communications plan development. This is foundational to later execution steps.
What does the acronym 'ECCM' stand for in expeditionary comms?
Electronic Counter-Countermeasures
Emergency Communications Contingency Module
Expeditionary Command Communications Management
Enterprise Cloud Communications Model
ECCM stands for Electronic Counter-Countermeasures and refers to techniques that protect friendly communications from enemy jamming. It's vital in contested environments. The concept is defined in communications doctrine to ensure signal integrity.
According to AFI 10-201, who is responsible for the Comm Squadron expeditionary plan?
The Communications Squadron Commander
The Base Civil Engineer
The Operations Group Commander
The Wing Commander
The Communications Squadron Commander is charged with developing, updating, and executing the expeditionary plan according to AFI 10-201. This ensures focused leadership and accountability. Commanders oversee all phases of the plan lifecycle.
Which document outlines the Theater Security Package communications requirements?
Annex F to the Operation Plan
AFMAN 33-152
DODI 8100.02
AFI 33-115
Annex F of the Operational Plan (OPLAN) details the communications and network requirements for the Theater Security Package. It is part of joint planning. This annex guides technical and support planning.
What is the first step in the deployment planning cycle?
Mission analysis
Sustainment operations
Force reception
Deployment execution
Mission analysis initiates the planning cycle by identifying tasks, constraints, and required resources. It shapes the subsequent deployment strategy. Accurate analysis ensures alignment with higher headquarters objectives.
Which system provides secure mobile voice services in the field?
Link 16 Radio Terminal
AN/PRC-117G
GATR Satellite Terminal
Blue Force Tracker
The AN/PRC-117G is a tactical, multi-band, software-defined radio providing secure voice and data. It's widely fielded for expeditionary use. Its flexibility supports varied mission profiles.
What is the standard expeditionary communications package called?
Bare Base Package
Expeditionary Network Unit
Combat Air Forces Kit
Theater Deployable Communications
Theater Deployable Communications (TDC) is the Air Force's standardized expeditionary comms kit, providing voice, data, and video services. It deploys in modules to support operations. AFI 10-201 references TDC for planning.
In AFI 10-201 planning, what does 'RED' refer to?
Regional Exploitation Directive
Reconnaissance and Entry Detachment
Required Equipment Deployment
Rapid Engineer Deployment
In expeditionary comms, RED refers to Reconnaissance and Entry Detachment tasked with initial site assessment and setup. RED teams validate infrastructure and report requirements. They are the vanguard of comms deployment.
What term describes the continuous process of adjusting comm plans during a deployment?
Plan adaptation
Dynamic re-tasking
Static allocation
Fixed planning
Plan adaptation is the ongoing refinement of expeditionary comms plans to meet changing operational requirements. It ensures the comms architecture remains effective. AFI 10-201 emphasizes flexibility and adaptation.
Which frequency band is commonly used for long-haul HF communications in deployed environments?
SHF
UHF
VHF
HF
High Frequency (HF) bands, typically 3 - 30 MHz, support long-haul beyond line-of-sight communications in expeditionary operations. They are essential when satellites are unavailable. AFI 10-201 includes HF planning for redundancy.
Which term defines the baseline set of COMSEC items for deployment?
Keying Material Kit
Secure Baseline Pack
COMSEC Inventory
Encryption Deployment Set
A Keying Material Kit contains necessary cryptographic keys and devices for secure operations. It's the COMSEC baseline for expeditionary units. AFI guidance ensures proper accountability and handling.
What is the role of an Expeditionary Network Operations Center (ENOC)?
Operate ground-based radar systems
Direct physical security of comms sites
Develop expeditionary tactics
Manage and monitor deployed networks
The ENOC oversees network health, performance, and security across the deployed communication architecture. It provides 24/7 monitoring, incident response, and maintenance. AFI 10-201 mandates ENOC capabilities in plans.
Which exercise type tests the full deployment of an expeditionary comm package?
Deployment Exercise (DEPUEX)
Maintenance Exercise
Tabletop Exercise
Command Post Exercise
A Deployment Exercise (DEPUEX) validates the ability to transport, set up, and operate expeditionary comms in an austere environment. It's a practical test of plans and equipment. AFI 10-201 requires periodic DEPUEXs.
True or False: AFI 10-201 requires annual review of the expeditionary comms plan.
False
True
AFI 10-201 mandates that expeditionary communications plans be reviewed and updated at least annually to reflect new threats, technologies, and mission changes. This ensures currency and effectiveness. Regular review prevents planning gaps.
Which unit provides the Tactical Communications Package during initial entry?
Aerial Port Squadron
Combat Communications Squadron
Security Forces Squadron
Civil Engineer Squadron
Combat Communications Squadrons deploy Tactical Communications Packages to establish core comms capabilities during initial entry operations. They are trained for austere and hostile environments. AFI 10-201 directs their employment in phased deployments.
Which tool is used for planning spectrum allocation in deployed locations?
EC-FoRMS
Spectrum XXI
Red Cell Analyzer
Link Planner
Spectrum XXI is the Air Force's automated tool for coordinating and managing frequency assignments in deployed environments. It helps avoid interference and ensures compliance. AFI guidance directs its use for spectrum planning.
In AFI 10-201, what is the purpose of the Communications Support Plan (CSP)?
Outline medical evacuation procedures
Document frequency allocation only
Provide a detailed blueprint for comms support
Detail logistical movement of equipment
The CSP is the authoritative document that outlines how communications support will be provided, including services, infrastructure, and staffing. It integrates with operational plans and annexes. It ensures all stakeholders understand the comms architecture.
Which annex of an OPLAN contains the communications-electronics (C-E) plan?
Annex F
Annex C
Annex A
Annex H
Annex F of an Operational Plan contains the Communications-Electronics plan detailing messaging, frequency, encryption, and network support. It's critical for joint C-E execution. AFI 10-201 references Annex F for comms planning.
What key document outlines host-nation frequency approval requirements?
NTIA Manual 65
AFMAN 33-152
JP 6-0
DODI 4650.01
NTIA Manual 65 provides guidance on obtaining host-nation frequency approvals for DoD operations. It lists bilateral agreements and approval processes. AFI 10-201 requires planners to follow NTIA Manual 65.
Which process ensures COMSEC materials are protected during transit?
Critical Asset In-Transit Approval
Courier Authorization
TEMPEST monitoring
Blue Shield Escort
Courier Authorization is the formal process to move COMSEC material securely, requiring credentialed couriers and documentation. It mitigates risk of compromise. AFI 10-201 and COMSEC policy reference it for deployments.
During which expeditionary phase is equipment reset conducted?
Execution
Initial Entry
Sustainment
Redeployment
Equipment reset, including maintenance and configuration updates, occurs during redeployment to prepare assets for future operations. It closes the deployment cycle. AFI 10-201 emphasizes reset to maintain readiness.
What tool is used for tracking deployed equipment visibility?
ALIS
CBNU
G081 Locator
GCSS-AF
Global Combat Support System - Air Force (GCSS-AF) tracks maintenance, supply, and deployed equipment visibility. It provides real-time status for planners and logisticians. AFI 10-201 requires equipment tracking.
Which publication governs host-nation spectrum management in deployed areas?
SECNAVINST 2400.1
DoD Manual 4630.5
AFMAN 33-152
AFI 32-1062
DoD Manual 4630.5 provides procedures for spectrum supportability and host-nation coordination in deployed theaters. It details approval, monitoring, and interference resolution. AFI 10-201 references it for frequency planning.
What is the maximum expeditionary comms site footprint defined in TDC?
15 20-ft ISO containers
10 20-ft ISO containers
25 20-ft ISO containers
20 20-ft ISO containers
Theater Deployable Communications packages are modular and designed to fit within 15 20-foot ISO containers for transport. This footprint balances capability and mobility. AFI tables provide container counts per module.
Which platform provides SATCOM relay for TDC?
Harris Falcon III
MBITR Radio
Wideband Enterprise Terminal
AN/TSC-154
The Wideband Enterprise Terminal (WET) provides Ku-band and X-band SATCOM connectivity for TDC modules. It enables long-haul, high-bandwidth links. AFI 10-201 references WET for satellite planning.
True or False: The Communication Focal Point (COM Focal) is the single interface for all spectrum issues in the theater.
False
True
The COM Focal Point serves as the theater's single point of contact for spectrum management issues, coordinating with host nations and joint partners. It ensures centralized control and deconfliction. AFI 10-201 designates this role.
Which report documents the status of deployed communications systems daily?
Logistics Dashboard
Comm Status Log
Daily SITREP
Ops Summary Report
The Daily Situation Report (SITREP) includes key performance and status indicators for deployed comms systems. It provides commanders with operational visibility. AFI 10-201 requires daily SITREPs during deployments.
What is the primary consideration when planning power requirements for a TDC site?
Number of generators
Physical security of fuel
Total kilowatt demand and backup provisions
Fuel cost only
Planning must account for total kilowatt demand of all equipment, redundancy, and UPS/battery backup. This ensures uninterrupted operations. AFI 10-201 outlines power planning criteria.
Which network segmentation practice enhances security in expeditionary environments?
Flat network design
Air-gapping classified enclaves
Using single VLAN for all traffic
Shared address space
Air-gapping classified enclaves physically or logically isolates sensitive networks from lower classification or unclassified networks, reducing compromise risk. It's a standard security practice in deployments. AFI 10-201 and security policies mandate separation.
Which metric measures the reliability of expeditionary comm links?
Latency
Throughput
Bandwidth
Availability percentage
Availability percentage quantifies uptime versus total scheduled time, reflecting link reliability. It's commonly used to assess expeditionary communications performance. AFI 10-201 guidance uses availability in metrics.
Which process in AFI 10-201 addresses rapid site survey and frequency planning?
Frequency Management Board
Site Reconnaissance and Survey
Spectrum Deconfliction
Operational Assessment
Site Reconnaissance and Survey (SRS) teams conduct rapid assessments of terrain, power, and spectrum conditions to inform frequency planning and antenna placement. This process is critical in early deployment phases. AFI 10-201 details SRS requirements.
What AFI outlines the TEMPEST requirements for deployed communications?
AFI 33-200
AFI 10-201
AFI 33-201
AFMAN 33-152
AFI 33-200 provides guidance on emissions security (EMSEC), including TEMPEST, to prevent compromising emanations from electronic equipment in deployed and fixed locations. It complements expeditionary planning by securing communications.
Which encryption device is specified for use with the TDCKU terminal?
KIV-7
KG-175 TACLANE
KG-84A
ANDVT
The KG-175 Tactical Inline Crypto Device (TACLANE) is used with TDCKU terminals to encrypt IP traffic over satellite links, providing high-speed secure connectivity. AFI 10-201 equipment lists specify the KG-175.
What is the latency threshold for IP-based applications over SATCOM in expeditionary environments?
Under 100 ms
Under 500 ms
Under 250 ms
Under 50 ms
IP applications over SATCOM typically aim for latency under 250 ms to maintain usability of services like VoIP and video. Higher latency degrades performance. Planning metrics in AFI 10-201 reflect this threshold.
Which element ensures priority call handling in a congested deployed network?
Dynamic IP allocation
Quality of Service (QoS)
Frequency hopping
Data compression
Quality of Service (QoS) mechanisms prioritize voice and mission-critical traffic over best-effort data, ensuring reliability during congestion. TDC designs incorporate QoS profiles. AFI 10-201 highlights QoS planning.
What is the recommended security zone separation between classified and unclassified networks?
Air-gap or controlled firewall with TS/SCI endorsement
Two separate VLANs without firewall
One physical switch
Shared network with encryption only
Classified and unclassified networks should be separated by either air-gapping or firewalls approved for TS/SCI enclaves to prevent leaks. Proper separation is a core security principle in expeditionary deployments.
Which joint publication provides guidance on communications support for humanitarian assistance?
JP 3-29
JP 3-13
JP 3-0
JP 3-11
JP 3-11 covers Joint Doctrine for Operations in Chemical, Biological, Radiological, and Nuclear (CBRN) Environments, but also includes guidance for humanitarian assistance communications. It ensures interoperability. AFI 10-201 planners integrate JP 3-11.
What system provides deployable secure video teleconferencing (VTC)?
JDISS Terminal
VTC Kit-8
Secure Tactical Terminal
Infantry Satellite Terminal
The Secure Tactical Terminal (STT) kit supports secure VTC and teleconferencing in deployed environments, leveraging SATCOM or terrestrial links. It ensures OPSEC and interoperability. AFI 10-201 references STT modules.
Which process ensures electromagnetic environmental effects (E3) compliance?
Spectrum Monitoring
Frequency Survey
E3 Certification Testing
Signal Masking
E3 Certification Testing validates that deployed systems meet electromagnetic compatibility and interference standards. It prevents equipment conflicts and hazards. AFI 10-201 requires E3 compliance before fielding.
What is the minimum staffing for an ENOC during high OPTEMPO operations?
Single operator
Two network managers and one NCOIC
One network manager and one technician
Four technicians
AFI 10-201 recommends at least one network manager and one technician in the ENOC to handle configuration, troubleshooting, and incident response during high operations tempo. This team balance ensures coverage.
Which cryptographic keying method provides over-the-air rekeying capabilities?
Over-the-Air Rekeying (OTAR)
Black Key Transfer
Manual Key Fill
Maintenance Fill
Over-the-Air Rekeying (OTAR) allows secure distribution of COMSEC keys via encrypted channels, reducing the need for physical key transfers. It enhances agility in deployments. AFI and NSA guidance endorse OTAR.
Which concept describes the ability to restore comms after an outage quickly?
Availability
Resiliency
Reliability
Redundancy
Resiliency refers to the capacity of communications systems to recover swiftly from disruptions. It includes diverse paths and rapid reconfiguration. AFI 10-201 emphasizes resilience in expeditionary architectures.
What is the primary advantage of using a mesh network in expeditionary operations?
Automatic route recovery and redundancy
Lower equipment cost
Higher latency
Simpler configuration
Mesh networks provide dynamic routing, self-healing capabilities, and redundancy by allowing nodes to relay traffic. This enhances network resiliency in hostile or infrastructure-poor environments. AFI 10-201 planning acknowledges mesh benefits.
Which planning factor accounts for satellite access windows?
Antenna gain
Frequency spacing
Waveform type
Orbital availability
Orbital availability refers to the time periods when satellites are in range and aligned for communication. It's critical for LEO and MEO links. AFI 10-201 planners schedule operations within these windows.
True or False: The Expeditionary Site Planning Template must include TEMPEST buffer zones.
False
True
TEMPEST buffer zones prevent compromising emanations by establishing minimum separation distances. The Expeditionary Site Planning Template must document these zones for each high-value enclave. AFI 10-201 references TEMPEST requirements.
Which encryption algorithm is mandated for Type 1 encryptors in expeditionary comms?
DES
AES-256
RC4
Twofish
Advanced Encryption Standard with 256-bit keys (AES-256) is mandated for Type 1 COMSEC devices to provide top-secret level protection. It's approved by NSA for classified communications. AFI 10-201 equipment lists require AES-256 for encryptors.
What is the maximum allowable E3 emission level for deployed radios per MIL-STD-461?
CE102 limit at 30 MHz
CS101 limit at 10 MHz
RS103 limit at 100 MHz
RE102 limit at 200 MHz
MIL-STD-461RE section RE102 specifies radiated emission limits for military equipment at frequencies above 30 MHz up to 18 GHz. It's the governing standard for deployed radios electromagnetic compliance.
Which cryptographic management center (CMC) function is crucial for expeditionary operations?
Circuit switching
User authentication
Key generation and distribution
Hardware maintenance
CMCs handle generation, loading, distribution, and accounting of cryptographic keys. In expeditionary environments, timely key support is vital for secure communications. AFI and NSA policies assign this role to CMCs.
What technique mitigates jamming against SATCOM terminals?
Frequency hopping
Continuous wave transmission
Fixed channel operation
Single-tone beaconing
Frequency hopping spreads transmissions across multiple channels to complicate enemy jamming efforts. SATCOM terminals implementing frequency agility resist interference. AFI 10-201 references anti-jam measures.
Which advanced planning concept integrates cyber effects with expeditionary comms?
Electronic Warfare Integration Plan
Integrated Network Effects Planning
Joint Fires Network Planning
Cyber Tactical Synchronization
Integrated Network Effects Planning synchronizes cyber operations with physical network deployments to achieve desired operational outcomes while protecting comms. It's an emerging doctrine within AF planning.
0
{"name":"What is the primary purpose of AFI 10-201?", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"What is the primary purpose of AFI 10-201?, Which section of AFI 10-201 addresses initial deployment planning?, What does the acronym 'ECCM' stand for in expeditionary comms?","img":"https://www.quiz-maker.com/3012/images/ogquiz.png"}

Study Outcomes

  1. Interpret AFI 10-201 Guidelines -

    Understand the core principles and framework of AFI 10-201 to support expeditionary communication planning and execution.

  2. Implement MPTO 00-33A-1001 Procedures -

    Apply key steps from MPTO 00-33A-1001 to establish and maintain reliable field communication systems under expeditionary conditions.

  3. Analyze Communication Contingency Plans -

    Examine expeditionary communications plans to identify critical components, potential failure points, and necessary redundancies.

  4. Apply Expeditionary Project Management Techniques -

    Use best practices in expeditionary project management to coordinate resources, timelines, and stakeholder requirements effectively.

  5. Assess Field Communications Strategies -

    Evaluate tactical field communication methods and technologies to ensure mission success and adaptability in austere environments.

  6. Identify Readiness Gaps -

    Pinpoint areas for improvement in your expeditionary communications knowledge and skills to enhance deployment readiness.

Cheat Sheet

  1. Understanding AFI 10-201 Planning Framework -

    AFI 10-201 lays out the standardized expeditionary communications planning process, from Concept of Operations to Execution Checklists. Remember "PLAN": Purpose, Logistics, Assets, Network - this mnemonic ensures you cover every critical planning element (USAF AFI 10-201, para 2.1).

  2. MPTO 00-33A-1001 Preventive Maintenance Essentials -

    MPTO 00-33A-1001 details mandatory preventive maintenance tasks for expeditionary comms gear, including weekly inspections and lubrication points. Use the "I-SLIP" mnemonic (Inspect, Secure, Lubricate, Inspect again, Pack) to keep maintenance consistent under field conditions (Air Force Materiel Command).

  3. Network Topology & Signal Range Calculations -

    Designing an expeditionary network often relies on the Friis transmission equation: Pr = Pt·Gt·Gr·(λ/4πR)². A quick mnemonic - "Four Pi Are Round" - helps recall the denominator when estimating line-of-sight radio ranges (IEEE Communications Society).

  4. Expeditionary Project Management Phases -

    Align your tasks with the five PMBOK phases: Initiation, Planning, Execution, Monitoring & Control, and Closing. Visualize the Project Management Triangle (Scope-Time-Cost) to balance mission priorities and resources in expeditionary environments (PMI® standards).

  5. Risk Assessment & FMEA in Field Ops -

    Implement Failure Modes and Effects Analysis (FMEA) to rank potential failures by Risk Priority Number (RPN = Severity×Occurrence×Detection). Use the "3D" approach - Define, Detect, Decide - to streamline your risk reviews under duress (Defense Acquisition University).